China
联系人 Ms. Angela
No. 228 Jinsong 7 road, Qingdao, Shandong
6m(*0ft) wide
Portable Steel Frame Shelter. Fast install and Removable.
Only need **3 people, and **4 hours to install. Easily
to be assembled and disassembled to move between sites. All
parts needed for installation are included, like anchors,
bolts.
Model: TC*****2:
W6.1 x L6.1 x H3.*6m (W*0 xL*0
xH*2),
Model: TC*****2:
W6.1 x L9.*5 x H3.*6m (W*0 xL*0
xH*2),
Model: TC*****2:
W6.1 x L*2.2 x H3.*6m (W*0 xL*0
xH*2),
Model: TC*****2:
W6.1 x L*5.0 x H3.*6m (W*0 xL*0
xH*2)
1. All
Steel frame is hot galvanized.
2. Zipper
roll up door in both ends, size W4.0xH2.4/3.3m (W*3 x
H8/*1)
3. Fabric:
**0g/m2 PE or **0g/m2 PVC with *0 years longevity, UV resistant,
Fire retardant.
4.
Delivery time : *5 Work Days/Container after order
confirmed.
5.
Package: Steel Crate, or Steel sheet iron
box.
国家: | China |
型号: | TC202012, TC203012, TC204012, TC205012 |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | 1 Set |
包装细节: | steel crate |
交货时间: | 7 to 15 days |
供应能力: | - |
付款方式: | - |
產品組 : | - |