看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
API Ceramic Liner for Mud Pump Parts
Next

API Ceramic Liner for Mud Pump Parts

离岸价格

获取最新报价

|

3 Piece Minimum Order

国家:

China

型号:

9P-100/10P-130

离岸价格:

获取最新报价

位置:

China

最小订单价格:

-

最小订单:

3 Piece

包装细节:

steel frame, wooden board, and metal strap

交货时间:

approx. 30 days after order, depending upon order

供应能力:

300 Piece per Month

付款方式:

T/T, L/C

產品組 :

-

现在联系
免费会员

联系人 Wade

Mingshui, Zhangqiu, Jinan City, Shandong, Jinan, Shandong

现在联系

产品规格

  • Standard or Nonstandard: Standard
  • Structure: Piston Cylinder
  • Power: Hydraulic
  • Body Material: Zirconia

详情

The average working time of Ceramic liner is ***0~****0 hours, and the minimum time is ***0 hours. This product has various advantages, such as wear-resistance, erosion-resistance, high pressure-resistance, high hardness, and so on. They are widely used in tough environments such as deep oil reservoirs, hard stratum, and offshore oil and natural gas exploitation. The liners feature high wear and erosion resistance, and high hardness.  They improve drilling efficiency and reduce the cost of maintenance and labor.
 
We can provide the following liners:
 
EMSCO: F***0, F***0, F***0, F***0, F****0, F***0, F***0, FB****0, FB****0, FA****0, FA****0; FB****0, FB****0; Db***0; D***0, D***5, D***0;
 
GARDNER DENVER: PZ*7, PZ*8, PZ*9, PZ**0, PZ**1, PZ-L, PA*8, Pah, Fy-Fxd, Fo-Fxo, Fd-Fxx, Fg-Fxg;

IDECO: T**0, T**0, T***0, T***0, T***0

NATIONAI: 7P*0, 8P*0, 9P**0, *0P***0, *2P**0, K***0, K***0A, K***0, K***0A, K***0

OILWELL: A**0PT, A**0PT, A**0PT, A**0PT, A***0PT, A***0PT, A***0PT
 
OMEGA: Opi***0; Ls: 3Nb***0, 3Nb****0, 3Nb****0, 3Nb***0C, 3Nb****0Cy;
 
QZ: Sl3Nb****0, Sl3Nb****0A, Sl3Nb****0B, Sl3Nb****0.
 

国家: China
型号: 9P-100/10P-130
离岸价格: 获取最新报价
位置: China
最小订单价格: -
最小订单: 3 Piece
包装细节: steel frame, wooden board, and metal strap
交货时间: approx. 30 days after order, depending upon order
供应能力: 300 Piece per Month
付款方式: T/T, L/C
產品組 : -

Send a direct inquiry to this supplier

至:

Wade < Zhangiu Con-Victory Manufacture Co., Ltd. >

我想知道: