We Buy equipments-Pure Water(15000 b/h=0.5L) and Carbonated
Lemonade (6000 b/h=0.5L)- and our Drawing for Dali 2011. We with
you already long ago communicate, but beside us intentions serious
in relations cooperation. We "OMK Industries" plan to invest in
production drink products in China (Yunnan, Dali). We mark to build
the plant on production Pure Water (capacity 15000 b/h=0.5L, and
other formats 0.25-0.35-0.6L) and Carbonated Lemonade (capacity
6000 b/h=0.5L) and sell in ***** lines of water and lemonade must
be in one building -1 Workshop. But in any event first queue we
shall enter the production Pure Water -15000 b/h-0.5L, but the
second queue shall enter the production a lemonade-6000 b/h=0.5L,
this for mark. Thereby, we need following equipments or well will
if you see our drawing on accomodation of the equipments in our
Workshop, but I try you to give list of the necessary equipments:
Water Treatment Equipment and Water Storage System (your
variants-for water and lemonade-2 in 1 equipments or 2 separate
equipments); SIP Cleaning System (for Lemonade); Sugar Melting
& Lemonade Preparation System (for Lemonade); Refrigerating
System-Carbonated Mixer saturation (for Lemonade); PP or PE Cap
Injection moulding machine (will work 24 hour-1 machine for 2
lines(water and lemonade)-15000 cap/h); PET-Preform Injection
moulding machine (will work 24 hour-1 machine for 2 lines(water and
lemonade)-15000 cap/h); PET-bottle Blowing Molding Machine (your
variants-for water and lemonade- 2 in 1 equipments (24 hour) or 2
separate equipments (15000 b/h and 6000 b/h); Rinser-Filler-Capper
Machine (2 sets): 1) for Water-15000 b/h, 2) for Lemonade-6000
b/h=0.5L); PVC or PP Labeling Machine (2 sets): 1) for Water-15000
b/h, 2) for Lemonade-6000 b/h=0.5L); Dating machine (2 sets): 1)
for Water-15000 b/h, 2) for Lemonade-6000 b/h=0.5L); PE-film
Shrinking-Wrapping-Packing machine (2 sets): 1) for Water-15000
b/h, 2) for Lemonade-6000 b/h=0.5L).