联系人 Ms. janet
longyu road, Luoyang, Henan
CITIC IC ball mill
In mine equipment, the ball mill is one of the
necessary equipment, and the ball mill is one of the main working
parts of the ball mill. Ball mill barrel in the work, in addition
to receiving the static load of the grinding media, but also by the
impact of grinding media, and the cylinder is a rotating, so the
stress generated on the cylinder is changed. The metal material of
the cylinder body is of high strength and good plasticity, and can
be welded with common structural steel Q**5, and the cylinder of
the large mill is made of *6Mn steel.
Every bin on the cylinder should have a
grinding door (also known as Kong Men). Grinding door is convenient
for personnel to enter, inserts for lining board, partition board,
filled or emptied grinding media, and stop grinding mill inspection
operation. The position of each bin should be staggered on both
sides of the cylinder, and the centrifugal force generated by the
gravity of the grinding gate. In order to ensure the strength of
the cylinder, the shape of the grinding door is generally round,
oval or round shape, so as to avoid the crack caused by the stress
concentration and cause the damage of the cylinder.
Mill operation and stopped for a long time when
the length of the cylinder is not the same, this is due to the
different barrel temperature caused by thermal expansion and
contraction caused by. In order to ensure that the gear meshing
normally, near the mill transmission device of unloading terminals
are not allowed to have any axial movement, therefore, to be in the
feed end set to adapt to the axial thermal deformation of the
structure: A is reserved clearance between shaft neck of hollow
shaft shoulder and bearing; another is the bearing seat and between
the floor horizontal mounting a plurality of steel and, when heat
expansion and cold contraction of a cylinder body, feed end of main
bearing base along the roller moving.
国家: | China |
型号: | - |
离岸价格: | 100000 ~ 500000 / Set ( Negotiable ) 获取最新报价 |
位置: | - |
最小订单价格: | 100000 per Set |
最小订单: | 1 Set |
包装细节: | - |
交货时间: | 15 |
供应能力: | 5000 Ton per Day |
付款方式: | T/T, L/C, D/A, D/P, Other |
產品組 : | - |