South Korea
联系人 Kyuwon
Yongsan-dong, Seoul
1.Brown coil inlet door: Brown coil inlet (double door
handle)
2.Interim checkout: Interim checkout in combustion chamber
(ignition and re-curringer treatment)
3.Re-treatment Door: Air for Primary Combustion
4.Song blower: Air for primary combustion
5.2nd blast inlet: inlet by ID fan (dampers
control)
6. Attaching Controllers
7.Low water level, temperature sensor, thermometer, and
anniversaries
8.Genator Connections
9.The door to the secondary reprocessing unit
below.
*0.Heated Reversal Waterway
*1.Top Cleaner
*2.Controller,Manual,Automatic,Off Switch
*3.main combustion chamber: water pipe rothol and primary air
pipe
Coal boilers feature:
1.The inside of the combustion chamber consists of a water pipe
rostle and a primary air pipe for complete
combustion.
2.No deformation of the rostall.
3. Install a dust collector to minimize fine dust
generation.
4. Automatic control is installed for convenient and safe use such
as low water level and boiler overheating.
5.The 3PASS structure provides efficiency, makes it easy to remove
ash from the upper and lower combustion chambers, and prevents
explosion due to the high-efficiency heat-resistant
fan.
国家: | South Korea |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |