联系人 Ms. Serpil
atiker sanayi sitesi, KONYA, TURKEY
Cup-lock Type Scaffolding is a system used as both high load carrier and facade scaffolding. This is a scaffolding system high endurance and safety values used in heavy laying and taller building constructions. It is particularly used as below-beam carrier scaffolding system. Mounting and dismounting is considerably easy.
Mounting and dismounting is performed swiftly by only using a hammer. There is no risk of missing any part since they are displaceable. This ensures a safe and swift joint. Joint of vertical and horizontal components is carried out in an easy way without a need of any wedge or nut. Height adjustment is convenient by means of upper and lower adjustment jacks. The system is comprised of upper and lower cup props and interconnection of forged headed horizontal components that prevent twisting of props.
Cup props, which construct the system, are manufactured from *8 x 3 mm TSE Certificated industrial pipes of *0, **0, **0, **0, **0 and **0 cm in length at **0 cm cup intervals (*0 cm according to load) as a standard. Cups are made of 5 mm sheet and welded to the props. There are movable covers on these cups that are manufactured as nodular cast iron and that enable horizontal components locked.
On pipes that are made *8x3 mm in size, there are cups and upper bowl; *-in every half meter and *-in every one meter. Cups are made of 5 mm A1 quality steel. Upper bowls are nodular cast iron. Welding is carried out by automatic gas metal arc welding robots.
On pipes that are made *8 x 3 mm in size, there are cups and heads; *-in every half meter and *-in every one meter. Cups are made of 5 m A1 quality steel. Upper bowls are nodular cast iron. Welding is carried out by automatic gas metal arc welding robots.
It is made of *8 x 2.5 mm pipe. Almonds made of forged steel are welded on both ends
It is made of *8 x 2.5 mm pipe.
It is used for interconnection of props. It is made of *0 x 2.5 mm pipe and in *5 cm length.
Head is made of **5 x **0 x 8 mm sheet and lug is made of *0 x *0 x 4 mm sheet. Shaft is made of *5 mm full shaft and has square head screw and nodular cast nut. It is used in height adjustments and below - beam formwork props.
Head is made of **5 x **0 x 8 mm sheet. Lug is made of *0 x *0 x 2.5 mm sheet and pipe is made of *0 x 2.5 mm sheet. .
Head is made of 5 mm sheet. Shaft is made of *5 mm full shaft and has square head screw and nodular cast nut. It is used in height adjustments and below - beam formwork props.
Head is made of 5 mm sheet. Shaft is made of *5 mm full shaft and has square head screw and nodular cast nut. It is used in height adjustments and below - girder formwork props.
Shaft is made of *5 mm full shaft and has square head screw and nodular cast nut. Base slab is made of **0 x **0 x 5 mm ribbed sheet.
It is made of 2 mm sheet. It is used for facade scaffolding applications.
国家: | Turkey |
型号: | - |
离岸价格: | ( Negotiable ) 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal |
產品組 : | - |