看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。
点击注册--免费! |
Book call on your favorite time
Code
       

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services


Phoenix International Malaysia

5000 信任点

1 sentral, Jalan Stesen Sentral 5,Kuala Lumpur,Kuala Lumpur,Malaysia

查看电话号码

Member Badge
1st 年

Bitumen Asphalt 60/80

Malaysia

B6080

230 ~ 235 / Metric Ton ( Negotiable ) 获取最新报价

UAE Or Malaysia

230 per Metric Ton

200 Metric Ton

180KG New Steel Drums

CFR / CIF

5000 Metric Ton per Month

L/C, T/T

Straight Bitumen

现在联系

产品规格

Brand Name : Phoenix Bitumen 60/80 Type : Petroleum Asphalt Grade : 60/80 Softening Point : -

详情

DESCRIPTION:
Bitumen Penetration Grade 60/80 is a standard grade Bitumen usually used as a Paving Grade Bitumen suitable for road construction and to produce asphalt pavements with superior properties. This grade of Bitumen is mainly used in the manufacture of hot mix asphalt for bases and wearing courses. Penetration Grade Bitumen supplied by PHOENIX INTERNATIONAL A/S is petroleum grade bitumen, manufactured from fractional / vacuum distillation of crude oil. The Bitumen supplied by PHOENIX INTERNATIONAL A/S is produced from vacuum residue (short residue) feedstock. Penetration grade bitumen are specified by the penetration and softening point test. Designation is by penetration only. The penetration grade bitumen has thermoplastic property which causes the material to soften at high temperatures and to harden at lower temperatures. This unique temperature/viscosity relationship is important when determining the performance parameters such as the adhesion, theology, durability, and application temperatures of bitumen.
CHARACCTERISITCS AND SPECIFICATIONS:
PHOENIX INTERNATIONAL A/S guarantees that the Bitumen Grade 60/80 is produced in compliance to and is in conformity to AASHTO M20-70 and ASTM D946/D946M and meets the following specification requirements:
Technical Data
Properties Unit Test Method Min Max
Specific Gravity @25°C gr./cm3 ASTM D70 0.99 1.06
Penetration @ 25°C, 100g, 5s dmm. ASTM D5 60 80
Softening Point °C ASTM D36 45 53
Ductility @ 25°C cm ASTM D113 150 ---
Ductility @ 15°C cm 100 ---
Ductility @ 10°C cm 60 ---
Dynamic Viscosity @ 60°C Pa.s ASTM-D4402 800 ---
Loss of heating % ASTM D6 --- 1
Drop in Penetration after heating % ASTM D5 & D6 --- 20
Flash Point °C ASTM D92 240 ---
Solubility in Trichloroethylene % ASTM D2042 99 ---
Wax Content % EN 12606-1 --- 2
Spot Test --- AASHTO T102 NEGATIVE
Test Result after TFOT (5 Hours @ 163°C)
Loss on Heating %(wt.) EN 12607-2 --- 0.2
Retained Penetration % EN 12607-2 52 ---
Ductility @ 25°C cm ASTM D113 120 ---
Ductility @ 15°C cm ASTM D113 40 ---
 
Bitumen Asphalt 60/80 Bitumen Asphalt 60/80 Bitumen Asphalt 60/80 Bitumen Asphalt 60/80

联系我们

联系人:Mr. Med

公司名称:Phoenix International Malaysia

办公地址:1 sentral, Jalan Stesen Sentral 5, Kuala Lumpur, Kuala Lumpur, Malaysia,50470

电话号码:

查看電話號碼

移动电话:

查看手機號碼

传真号码:

查看傳真號碼

至,

Mr. Med < Phoenix International Malaysia >
我想知道:

更多產品來自 Phoenix International Malaysia

Penetration Grade bitumen 60/70 Penetration Grade bitumen
Penetration Grade bitumen 80/100 Penetration Grade bitumen
Penetration Grade bitumen 85/100 Penetration Grade bitumen
Oxidized Bitumen 115/15 (20KG Carton Box) Oxidized Bitumen 115/15
Oxidized Bitumen 115/15 (25KG Carton Box) Oxidized Bitumen 115/15
Blown Asphalt 115/15 (20KG Carton Box) Blown Asphalt 115/15 (20KG
Blown Asphalt 115/15 (25KG Carton Box) Blown Asphalt 115/15 (25KG
Straight Bitumen 85/100 Straight Bitumen 85/100
Straight Bitumen 60/70 Straight Bitumen 60/70
Polymer modified Bitumen Class 1 & 2 (PMB) Polymer modified Bitumen
Oxidized Bitumen 115/15 Oxidized Bitumen 115/15
Oxidized Bitumen 95/25 Oxidized Bitumen 95/25