1. Introduction PUXIN Household Household biogas digester system
for waste treatmentis composed of a 6 or *0 m3 PUXIN biogas plant,
pipe routes, gas purify devices and gas appliances or small power
biogas generator. PUXIN Household biogas digester system for waste
treatmentismainly applied to farmhouse or domestic house to treat
livestock waste, straw, human sewage and food waste. 2. Contrast
between fixed dome and Puxin biogas plant Contrast of the technical
requirements for the builders Items The traditional fixed dome
hydraulic biogas plant The Puxin Biogas plant Airtight craft Highly
required Not required Ability to understand blueprint Highly
required Not required Ability to build the arch Highly required
(build by hand) Not required (cast by mould) To judge and deal with
gas leaking Highly required Required To judge and deal with water
leaking Highly required Required Training period About 3 month
About one week Period to become a proficient builder **2 years
About one month Requirement of the people to be trained Medium
educated, strong ability to master skills Not Educated, medium
ability to master skills Success rate Not **0% guaranteed **0%
guaranteed Contrast of the maintenance Items The traditional fixed
dome hydraulic biogas plant The Puxin Biogas plant To mend the gas
leak of gas-holder Dangerous and difficult The job is done inside
the biogas digester, there is a possibility of poisoning. The leak
can not be found. Safe and easy The job is done on ground, there is
no possibility of poisoning. The leak can be seen, and can be
mended directly. To mend the water leak of the digester Dangerous
The digester’ outlet is too small that the air circulation in the
digester is bad. So, there is a possibility of poisoning. Safe The
digester’s outle
联系我们
联系人:Mr. Vane
公司名称:SHENZHEN PUXIN TECHNOLOGY CO. LTD
办公地址:1-2nd floor, Bldg 4, Masha Xuda High-tech. Industry Park, 49 Jiaoyu North Dd, Gaoqiao, Pingdi , Long, Shenzhen, Guangdong, China,518117