离岸价格
获取最新报价( Negotiable )
|Minimum Order
位置:
China
最小订单价格:
-
最小订单:
1 Set
包装细节:
seaworthy packing
交货时间:
50 working days
供应能力:
20 Set per Year
付款方式:
T/T, L/C
联系人 Ms. Judy
zhenbei road,Leyu Town, zhangjiagang, Jiangsu
Composition of the production
line
|
OD*****0mm
|
OD******0mm
|
Main extruder
|
SJ*5/*0/SJ*5/*0
|
SJ*0/*0/SJ*5/*0
|
Main motor power(kw)
|
*7
|
*5/*7
|
Max output(kg/h)
|
*0
|
**0/*0
|
Machine die head/mould
block
|
*0pairs/set
|
*0pairs/set
|
Pipe forming machine
|
BW-II
|
BW-III
|
Spray tank
|
Length ***0mm
|
*-
|
Pipe cutting machine
|
Saw blade cutter
|
*-
|
Pipe stacking shelf
|
Length ***0mm
|
*-
|
Hopper drier
|
STG-U**0
|
STG-U**0
|
Automatic feeding
machine
|
ZJ**0
|
ZJ**0
|
Plastic mixing
machine
|
SH*0
|
SH**0
|
Plastic crushing
machine
|
SWP**0
|
SWP**0
|