No.2 Jiangpu Road, Chahe Economic Development Zone, Chuzhou city, Anhui province, China, Chuzhou, Anhui
现在联系
详情
Qualification and working principle: Controlling the quicklime’s
reaction time (***5 minutes) in the container and fully hydrated
the quicklime. Make full use of the heat generated during the
reaction time. Raise the inner temperature to *0℃ by **5 minutes
and make the quicklime fully hydrated. Process of material feeding
control Scientific distribution of water consumption Dust removal
Meet your requirements for different purity of lime emulsion.