India
联系人 Mr. Pratik
203, Readymoney Premises, 167, Dr. A. B. Road, Worli, Mumbai, Maharashtra
1. Shell erection is faster, reducing the time factor
2. Lower risk of Accidents & Safety achievement is high
3. Easy Access for inspection at all stages
4. Quality of work is improved
5. Welding is unaffected by weather conditions
6. Higher capacity cranes are not needed
7. Special scaffolding arrangement not required
8. As jacks are connected to the tank load by Fail-safe, Slip-grip
mechanism, the tank cannot sink even if pump/hose breaks down.
国家: | India |
型号: | HJ12 |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |