联系人 songjuan
Changsha, Hunan
1. Construction cycle is short, high efficiency
:Aluminum formwork system for the fast form
removal system, generally ****6 hours to form removal, so only one
layer of aluminum templates plus three single support can be used,
a layer of the normal construction of up to **4 days, thus greatly
shorten the construction period, the construction units to save
administrative costs, as well as real estate developers to shorten
the development cycle .
2. Reusable Low cost
: Regulate the construction of a template can be
flipped **0 times or more, use of low cost
3. Easy construction, high efficiency
:Aluminum formwork system assembly is simple,
convenient installation, simply pro rata increase the standard
board, light weight aluminum template per square meter ****5KG.
Construction process is completely assembled by hand,
transshipment; does not depend Lifting
Equipment
4. Good stability, high
capacity:capacity up to *0KN
5. Wide range of applications
: Aluminum formwork system is suitable for
all building components, such as load-bearing walls, columns,
beams, stairs, balconies, etc., are available through the cement
pouring at once .
国家: | China |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |