联系人 Mr. David
No.7, Ln. 301, Cyonglin S. Rd., Sinjhuang Dist, New Taipei City
reach fire prevention zone while fire occurs in the
first place
Storeys inside the building are seperated into many fireproofing
zone, every zone is an independent zoning, when the fire takes
place in the building, the fire rescue comes first, if the fire
system is unable to bring overall effect, then the fire door will
close automatically while receiving an authorized signal from
fire-fighting system in order to limit an expanding damage and
prevent the building from causing an enormous harm because
of spreading by a large scale.
In the rule of building technology:
The measure area of total floor of the building exceeds***0
square meter should build a fire prevention construction and
equipments, fire equipments should also have heat block
function for over one hour time to hinder the heat (*0A)
Size type:
Unit |
W |
H |
Minimum |
***0(d) |
***0(h) |
Maximum |
***0(b) |
***0(f) |
W= Door Leaf Width
H= Door Leaf Height
DW= Rail Width
DH= Rail Height
Calculation:
d=b**0%
c=(a-b)+d h=f**5%
g=(e-f)+h
国家: | Taiwan |
型号: | Fire Prevent |
离岸价格: | ( Negotiable ) 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | 1 Piece |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | T/T |
產品組 : | - |