看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 立即加入 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Bridge Formwork System
Next

Bridge Formwork System

离岸价格

获取最新报价

|

- Minimum Order

国家:

China

型号:

-

离岸价格:

获取最新报价

位置:

-

最小订单价格:

-

最小订单:

-

包装细节:

-

交货时间:

-

供应能力:

-

付款方式:

-

產品組 :

-

现在联系
免费会员

联系人 wksform

Beijing, Beijing

现在联系

产品规格

详情

Box girder formwork is a type of building that uses box girders as the main structural component. A box girder is a hollow beam with rectangular and box shaped cross-sections. It is usually used for bridge construction.

Comprehensive Formwork Solutions for Bridge Construction: The Ultimate Bridge Formwork System Guide
 
Work-sun Bridge Formwork System is at the core of modern construction, providing reliable and efficient solutions for challenging projects. In this article, we detail our extensive range of formwork solutions for bridge construction including Box girder formwork, Segment formwork system, Precast Formwork, Immersed Tube Formwork, Tunnel Lining Formwork, Climbing Mount Formwork System, Hanging Basket, and the One Stop Solution Service Process. Our commitment to leading standards—Experience, Expertise, Authoritativeness, and Trustworthiness—is evident in every section below.
 
Box girder formwork
 
1. Introduction
Box girder formwork is a type of building that uses box girders as the main structural component. A box girder is a hollow beam with rectangular and box shaped cross-sections. It is usually used for bridge construction.The box girder formwork is used to support temporary structures of concrete during the construction process. It is usually made of steel and assembled on site.The box girder formwork is designed to give concrete the required shape and size, as well as support the weight of the concrete until it hardens and achieves structural strength.
 
2. Product Features
1. Widely used in all kinds of tunnel concrete construction.
2. Easy to use and flexible to disassemble.
3. Many turnover times, low cost amortization.
4. Concrete appearance quality is good.
5. Save labor costs, reduce engineering costs.
 
3. Product Advantages
1. light weight
2. The structure is simple, strong and stable
3. Easy to move, install and disassemble
4. Strong re-usability
5. Small stress and deformation
6. There is enough space under the hanging basket to provide large space for rod and formwork construction operations.

Segment formwork system
 
1. Introduction
The segment formwork is mainly used in the construction of cast-in-place concrete structures, especially in precast segmental bridge is very common, this technology allows different parts of the bridge to be poured concrete in the factory in advance and then transported to the site for installation.For pouring structures on construction sites, using segmental formwork can be poured in the site and ensure the consistency and strength of the structure.
 
2. Technical principle
The main beam is divided into appropriate lengths along the bridge and prefabricated into blocks, which are then transported to the construction site for installation, and the blocks become the whole bridge construction method after applying prestress.
3. Main feature
1) No brackets are required between the spans
2) During the construction process, the weight of the construction machinery and personnel is borne by the pier and the built beam segment, with the progress of the construction, the cantilever gradually extends, and the machinery and equipment are gradually moved to the beam end, and there is no need to support the beam from below.
3) Reduce the construction equipment, simplify the construction process
4) The porous structure can be constructed simultaneously to speed up construction.
5) The suspension assembly construction method makes full use of the strong negative moment bearing capacity of the pre-erected concrete structure, and transfers the positive curved rectangle in the span to the negative moment of the fulcrum, so as to improve the span capacity of the bridge.
6) Cantilever assembly construction can save construction cost and reduce the cost of T process.

国家: China
型号: -
离岸价格: 获取最新报价
位置: -
最小订单价格: -
最小订单: -
包装细节: -
交货时间: -
供应能力: -
付款方式: -
產品組 : -

相关产品 FWK Formwork Scaffolding International engineering Co., Ltd

Send a direct inquiry to this supplier

至:

wksform < FWK Formwork Scaffolding International engineering Co., Ltd >

我想知道: