联系人 Ms. Lihua
Xintang Industrial Area, Taizhou, Zhejiang
1. Mould Steel:
P*0, **8, ***8, H*3
2. Injection System: Could Runner / Hot Runner
3. Lifetime of the Mould: **0,******0,**0 times
4. Production Time: *****0 days. We'll have the first test in
****0 days, and *0 days later, after we finish the third mold test
and check the samples acceptable, we'll send one set of the sample
for your checking.
5. Mould schedule feedback: Feedback the mould course every half
month and attach picture of the mould.
6. When the mould has been completed, we will daub antirust oil on
mould surface or spray-paint according to customer's requirement.
Then put into wooden case with waterproof pellicle. Attached a bag
for mould spare parts: Assembly drawing of the mould, video of
mould test, a record report of mould test and inspection report of
sample.
国家: | China |
型号: | Plastic Mould |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |