联系人 Roy
Xinxiang, Henan
Double girder Overhead Crane is mainly comprised of the box-shaped
bridge, grab crab, trolley traveling mechanism, cab, and electric
control system. The load-handling device is the grab which is able
to capture bulk materials.
The grab crab has a switching mechanism and a lifting mechanism.
The grabs are separately hung over the switching mechanism and
lifting mechanism with four steel wire ropes, The switching
mechanism drives the grab to close to grab materials. When the grab
is closed, the lifting mechanism shall be started immediately to
hoist the four evenly loaded steel wire ropes.
Discharging only needs to start the switching mechanism, which
opens the grab to pour materials.
Except for the lifting mechanism, the crane is basically the same
as the bridge crane with a hook.
国家: | China |
型号: | - |
离岸价格: | ( Negotiable ) 获取最新报价 |
位置: | China |
最小订单价格: | - |
最小订单: | 1 Set |
包装细节: | national standard |
交货时间: | 30days |
供应能力: | 10000 Set per Day |
付款方式: | T/T, L/C |
產品組 : | - |