看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 立即加入 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Glass Production Line (Turnkey Project)
Next

Glass Production Line (Turnkey Project)

离岸价格

获取最新报价

|

1 Acre Minimum Order

国家:

China

型号:

-

离岸价格:

获取最新报价

位置:

-

最小订单价格:

-

最小订单:

1 Acre

包装细节:

-

交货时间:

-

供应能力:

-

付款方式:

-

现在联系
免费会员

联系人 Mr. Chen

No.12 Huanghe Road, Changshu, Jiangsu

现在联系

产品规格

  • Glass Type : Glass

详情

I. Main technical parameter:
1. Melt ability on the 1st: 40t/d
Fold into glass thickness is 5 mm, Daily output is 2600 m2
2. Product varieties: Colourless transparent glass; 
3. Product specifications: Thickness range 2- 10mm;
4. The width of original board of glass: 2400mm; 
5. Product quality: Accord with the national standard in the People's Republic of China; 
6. Comprehensive yield: 80%
7. Unit utilization ratios: 97.5%

8. Melts the life-span of the kiln: 4

1. Raw materials (The qualified powder material enters the factory)
1.1 Conditions of quality of different raw materials
image

Note: The accurate requirement of different raw materials should be decided after the quality of the raw material is confirmed. 

2. Fuel: Natural gas:

3. Supply power:
3.1 Demands consist of two pieces of independent power, so as to ensure that supplies power incessantly. 
3.2 That enters factory's voltage:10KV±5%, frequency 50Hz± 1%, supplies power steadily in succession. 
3.3 Supply power in workshop: 
Voltage 380V/220V±10%, frequency 50Hz. 
3.4 The installed capacity of  factories of equipment invites :100KVA; 
Calculate load in normal production: < 60kwh. 


4. Pictures
image

image

 
SN. Project
1 Raw materials workshop
2 Production unites the workshop
2.1 Melt the section
2.2 Shaping section
2.3 Section that anneal
2.4 Cut and judge the section of the finished product
2.5 Bits of broken glass system
3 Affiliated facility
3.1 Compress the air and stand
3.2 Circulating water system
3.3 Laboratory
4 Support the distribution system
5 System ofNatural gas
6 Installation and cold adjustment (cold adjustment is about 120days)

国家: China
型号: -
离岸价格: 获取最新报价
位置: -
最小订单价格: -
最小订单: 1 Acre
包装细节: -
交货时间: -
供应能力: -
付款方式: -
產品組 : Turnkey Project For Building Materials

Send a direct inquiry to this supplier

至:

Mr. Chen < Suzhou CMT Engineering Company Limited >

我想知道: