联系人 Ms. Sara
shipai, Dongguan, Guangdong
STEP 1 Making the Mold
Computerized system is used to engrave your design on to the mold
surface.
STEP 2 Injection
Material injected in to the mold
STEP 3 Elimination
On completion of injection, waste material is eliminated to reveal
the completed design.
STEP 4 Attachment
he back attachment is spot welded on to each piece.
STEP 5 Polishing
The surface of the metal is polished until smooth.
STEP 6 Plating
Various plating colors can now be processed. The quality of plating
varied with the length of time the metal is inmersed in the plating
solution.
STEP 7 Inspection and Packing
All items are strictly inspected before delivery. Customer's
satisfaction is guaranteed!
国家: | China |
型号: | YH-10003 |
离岸价格: | 获取最新报价 |
位置: | China |
最小订单价格: | - |
最小订单: | 1000 Piece |
包装细节: | 1pc/opp bag |
交货时间: | 20 days |
供应能力: | 5000000 Piece per Week |
付款方式: | T/T |
產品組 : | - |