联系人 Angela
A403, Building 3, No.18 HuaShan Road, New North District, Changzhou, Jiangsu
This Pre-stressed Concrete Spun Pole Production Line is designed in
accordance with annual production capacity of *6,**0pcs various
medium-sized cone pre-stressed steel concrete poles.
As far back as the ***0s, the Peoples Republic of China used
armored concrete pole. With the rapid development of power
industry, the production and use of concrete pole has developed
tremendously thereupon.
Pre-stressed concrete pole develops rapidly because of much
superiority. Compared with common concrete pole, its advantage is
as follows:
Economizing steel in a large amount, about *0%~*0% (adopting cold
drawing can economize *0%~*0%; in case of steel wire of high
strength, economize *0%~*9%);
Crack resistance is improved by 3~5 times;
Steel performance can be improved by 1~3 times;
Reduction of cost (adopting cold drawn wire can economize *5%~*0%;
in case of steel wire of high strength, economize*2%~*1%);
Good endurance can delay the appearance and expansion of
cracks;
Protecting the environment that mankind depends on for existence,
and reducing deforestation.
Pre-stressed concrete poles are strictly in accordance with two
standards: GB*****4 Annular Armored Concrete Pole and GB******4
Annular Pre-stressed Concrete Pole of the Peoples Republic of
China.
Process Flow | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Equipment List | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Lab Equipment List | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technology Characteristics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1. The proportioning and the measurement of concrete should
be accurate; 2. The error resulting from alignment and cutting length of reinforcing steel bar should reach 1.5/****0; 3. Tension strength of the reinforcing steel bar should reach *5% of its tensile strength; 4. Demoulding strength of pole should reach *0% of design strength for concrete. |
国家: | China |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | in containers |
交货时间: | - |
供应能力: | - |
付款方式: | L/C, T/T |
產品組 : | - |