联系人 Ms. Ramona
Group Five, Mianzhang Village, Jinhui Town, Fengxian , Shanghai China (Mainland) Zip: 201405, Shanghai, Shanghai
1,The way attracts models can divided into:dry and wet two attracts
models way.
2,Dry attracts models: Adhesive dry compound, into the machine
plastic called dry plastic, generally at room temperature of *5 DEG
C case, glue drying time : *0 to *0 minutes. *0 C and *0
environment, adhesive drying time of 3 – *0 minutes.
Recommendations for customers in the plastic film can be completely
transparent, plastic. Drying time is too long, the effect of
bonding effect. Especially for adding curing agent adhesive, should
try to shorten the drying time, spray dry within one hour after
must finish blister, otherwise it will affect the effect of.
3,Wet attracts models: Adhesive in wet condition, namely into the
machine called wet blister blister. Wet blister is mainly aims at
the customer equipment is unable to achieve the lowest activation
temperature or adhesive composite thin film temperature resistance
performance is very poor condition, as the adhesive in plastic
process water does not evaporate completely, therefore, plastic
time than the dry plastic long. Typically, as little as possible
using a wet composite, especially short heating time of plastic
operation, otherwise, the finished product is likely to occur"
sliding rubber" phenomenon.
B, Attentive proceeding of film
1,Different film have different reponse of high temperature,if
change the material,should produce abundantly after evaluating the
operate
condition.
2, To the best of our abilities to use the fim with low
plasticizers, because the film plasticizer in long time storage and
high temperature environment, it is possible to dissociate from the
surface, thus affecting the bonding effect.
3,For the soft film:advice to use longer attracts models time,and
relatively low plastic temperature.
C, Spurt gumwater and the amout
1,It should be equally when spurt the gumwater,compare the
plane,side and concave and convex surfaces need double glue.
2,Usually,the spurt aumwater mout of plane should be ****5g/m2, the
spurt aumwater mout of contour should be *5一**5 g/m2.
D,The lowest activation temperature of adhesive
The lowest activation temperature means in the plastic operation,
suction plastic activation produced by bonding performance of
minimum temperature, corresponding to the adhesive film can reach
temperatures, rather than the machine set temperature! Glue
normally, plastic temperature is higher, the more conducive to the
adhesive film on the composite film surface infiltration, pair
bonding effect favorable.But customers will often consider the
composite thin film heat resistant degree, and reduce the plastic
temperature.
E,The vacuum degree
1,The vacuum degree depends on the different plastic equipment,
films with different manufacturers, different film thickness,
temperature, plastic sheet surface profile, sheet placement,
customers should act according to own actual situation to make
corresponding adjustment.
2,Under normal circumstances,according to experience, to 0.*6mm a
0.*0mm thick film, in the machine set temperature ll0 ~ **0
conditions, the vacuum degree of: 0.*7Mpa 0.*9Mpa.
F,The time of vacuum degree
1, The vacuum time depends on: film hardness, plastic sheet
profile, temperature, vacuum degree, the customer should be
according to their own actual conditions do corresponding
adjustment.
2, under normal circumstances,according to experience, in ensure
plastic temperature reaches the adhesive activation temperature,
minimum film fully softened condition, vacuum time: 5 to *0
seconds.
G,Pressure
1, the capsule forming equipment and portion of capsule of plastic
equipment, in a vacuum, forming bins into hot air to form a high
pressure, ensure that the film pressing board, pressure depends on
the size of: plastic temperature, film thickness, sheet metal
profile, such as the degree of vacuum, the customer should be
according to their own actual situation to make the corresponding
adjustment.
2, According to experience, pressure is 2 ~ *8kg / m2.
3, For some without a capsule of plastic equipment, plastic only in
vacuum, no pressure, to ensure that the suction effect, its vacuum
degree should be increased. H,The time of pressure
1, For wet blister, suggested pressure time : 3 to 5 minutes.
2, For dry packing pressure time, recommended for: 2, 3
minutes.
I,The spray gun caliber
1, Under normal circumstances, spray gun caliber : 1.5 - 2.5mm.
2, Spray gun caliber is less than 1.0mm operation easy to plug
nozzle, affects the working efficiency; the spray gun of large
caliber.
Vacuum plastic decorative film pressing process control points
Membrane pressure technology in furniture industry especially is
very important in the production of doors and cabinets. Medium
density material is processed into a variety of linear and covered
with various brightness, color, texture of the plastic film, so
that the product of rich and colorful, a superb collection of
beautiful things, to the consumer to create a great choice.
However, the application of this technology to manufacture
products. Its quality is differ in thousands of ways. The cause of
these differences among the causes of substrate and the facing
material itself factors, process parameter control is also very
important. Below with some models of membrane compressor as an
example, using the two-component film adhesive, for the entire
process of.
The 1 film the working principle
The use of the diaphragm plasticity, through the membrane pressure
time, equipment cavity temperature and air pressure adjustment and
control to the diaphragm, heating, pressurizing, the diaphragm is
coated on the surface of a workpiece.
Work process: ( 1) placing a workpiece on the worktable; ( 2) into
the heating plate of the work table; ( 3) the heating plates and
the worktable together; ( 4) heating plate and a silicone membrane
between the air was pumped out, the silicone membrane adsorption to
the heating plate is heated; ( 5) to set the time after the heating
plate and the silicone membrane between the injection of compressed
air, the silicone membrane and diaphragm in close contact,
workpiece and the diaphragm is heated, while the diaphragm is to
soften the edges of the plates, the temperature reaches the
adhesive activation temperature; ( 6) the work table and the
diaphragm between the air was quickly pulled out to form a vacuum,
then the diaphragm and the heating plate between the injection
compression air, diaphragm in the setting of the pressure and
temperature of the role of being coated in a plate.
The 2 rules of operation
The 2.1 film adhesive application requirements
Film adhesive is a two-component adhesive, activation temperature
of about *0 oC. Storage temperature should be 5 - *0 DEG C, 5 DEG C
can cause floc node. Plastic barrels should not be placed directly
on the ground, should be placed in a wooden frame, especially in
winter. Film adhesive is valid without dismantling the original
packaging state, since the date of factory for 6 months.
Film adhesive proportion of main agent: curing agent = *0: 1, the
main agent and curing agent are mixed, should make the main agent
in mixing state, curing agent slowly adding and mixing at least 3
minutes. Each preparation of adhesive should be used up within 4
hours guarantee. Against the adhesive glue barrels should be
covered.
2.2 spray process requirements:
2.2.1 adhesive in order to front line to front end to end + linear,
the plane part, spray again can be; end face and a plane linetype
department need to spray two times.
2.2.2 main agent and a curing agent after mixing the active time of
*6 hours, has adhesive work should be finished in 4 hours to get
the best adhesion effect. Otherwise, glue cross-linking reaction
and activation temperature to rise, although look from the exterior
plywood effect is good, but temperature performance have
significantly reduced, if the two adhesive in PVC surface glue
mark.
2.2.3 after spraying surface pale and dry, hand touch sticky or
drying obviously after film gloss drying time for ****0 minutes (
depending on the environment temperature, humidity and spraying
quality ).
Commonly used
2.2.4 fan from workpiece 1.**2.0 meters at the workpiece to moist
air to blow away, in order to avoid artifacts due to humidity and
diaphragm bubble.
2.2.5 in the winter, in order to raise the temperature of the
workpiece, can use small house into the workpiece is heated to ***5
C conditions (no temperature is higher than *5 DEG C, otherwise the
workpiece deformation may be produced ). Spray should not lower
than *6 DEG C in a water environment on.
2.2.6 adhesive handlers should wear masks, to protect the health of
operators.
2.3 film machine silicone membranes using
According to the linear features ( such as arc values, angular,
linear width and depth ) choose a different thickness of silica gel
membrane.
Silicone membrane due to the often heated and stretched, the sag
will increase, should be based on silica gel membrane sagging
degree timely installation, reduce the droop.
In order to extend the silicone membrane life, prevent the
workpiece to produce quality problem, should be regularly exchanged
silica membranes using direction, such as front back left right
end, variable variable.
If the silica membrane corner have holes or short gap, available
silica gel and membrane repairing machine repair. When repairing
with flat heavy compaction, dry *4 hours, repair with **0 sandpaper
sand flat can be normal use.
The 2.4 process parameter settings
2.4.1 membrane pressure workpiece spacing: width is less than **0mm
narrow and long workpiece, workpiece spacing of not less than *0mm;
width greater than **0mm workpiece, workpiece spacing of not less
than *0mm; the workpiece and table frame spacing of not less than
*0mm. Transverse and longitudinal spacing should be in a straight
line, in order to reduce air flow resistance.
2.4.2 workpiece pad: plate width and length shall be than the
workpiece width and length of small **0mm, pad on the surface
surrounding the edges should be inverted radius 3mm5mm fillet or
inverted 3 x *5 DEG angle, in order to ensure the air between the
diaphragm and the workpiece is completely pumping diaphragm, to
firmly glued onto the workpiece edge effect. Plate thickness shall
be the thickness of 3 / 4 or so, is to ensure that the diaphragm is
one of the important measures to pull the white.
2.4.3: according to the different setting temperature of diaphragm,
temperature setting should be at **0 degrees C **0 DEG C, TPO
diaphragm temperature is higher, general PVC ( relative to high
light PVC ) temperature secondly, high light PVC should lower ( to
avoid high temperature due to loss of light ).
2.4.4 set time: preheating time should be *0s*0s ( diaphragm
between different colors, preheating time should also be different,
the light should be extended, dark should be appropriately
shortened; thick film should be extended, film should be
appropriately shortened), vacuum pumping time is about 8s, pressing
time for preheating time plus ***0s around. Reach the set pressure
time should not be too long, should be about 5S, to ensure the end
surface of the workpiece to the activation temperature above the
diaphragm and substrate adhesion and not excessive quickly without
stretching the workpiece on the diaphragm.
2.4.5 set pressure setting for 3.8bar4.2bar: positive pressure,
negative pressure for 0.7bar0.8bar, namely positive pressure and
negative pressure of about 4.5bar5.0bar.
For thicker workpiece, high optical diaphragm and a thickness of
less than 0.3mm film sheet should be appropriately reduced the set
temperature, appropriate to increase the preheating time and
increasing the work table, the bottom plate height, shortening the
distance with the heating plate, to reduce or avoid the color
problem.
2.5 trimming requirements
Machine processed workpiece, placed *0 minutes (to ensure that the
adhesive can be used only for the initial curing ) trimming.
After trimming with special tool scrape corners or **0 **0 of
sandpaper chamfering, make PVC below the surface of the workpiece.
And use alcohol thinner put back glue mark clean. Trimming check
quality, can repair in situ repair, can’t repair to pick out
further processing.
Membrane pressure after the workpiece must be face to face, placed
back to back to the flat material rack. *0 blocks of a crib, heavy
pressure from above, to prevent the deformation of the workpiece,
some time should not be less than *4 hours. Membrane pressure
workpiece reached metaphase curing time of *4 hours, completely
cured required 7 days, so to ensure the workpiece before packing
assembly for more than *4 hours.
3, Film pressure workpiece temperature test
Through the temperature resistance test can verify the membrane
pressure workpiece temperature performance. Temperature test to
collect specimens of relevant parameters, such as environmental
parameters, process parameters, plastic ( including activation
temperature, ex-factory date, spraying times ), PVC parameters (
thickness, gum, and other manufacturers ), processing time, display
time.
In the constant temperature box for temperature test, the test
temperature respectively *0 degrees, *0 C, *0 degrees C, *5 degrees
C, *0 degrees C, *5 degrees C, *0 degrees C. From low to high in
each temperature point for 1 hours, then check the specimen surface
and edge of the PVC is stripped or open edge, if low level
temperature without stripping or open, and when the rising level of
temperature stripping or open boundary, then the test sample
temperature for low level temperature. A specimen at *0 degrees C
test 1 hours PVC not peel or open edge, *0 degrees C test 1 hours
PVC stripping or open boundary, then the test sample temperature is
*0 C.
4, Common quality problems
4.1 fold
(1) the long and narrow spacing of the workpiece is too small;
(2) plate upper surface around corners without chamfer;
(3) the workpiece transversely of the longitudinal spacing in a
straight line, increases the air flow resistance;
(4) the set temperature;
(5) to set pressure for long periods of time.
4.2 white
(1) set the temperature too high;
(2) to set pressure for long periods of time;
(3) linear inappropriate.
4.3 the edge:
(1) adhesive quality is not good;
(2) adhesive activation temperature is too high;
(3) the temperature of the equipment is not up to the requirements
of the workpiece edge activation temperature;
(4) a workpiece pad is not appropriate;
(5) film adhesive performance is not good or no gum;
(6) gel has expired or does not match the storage and
requirements;
(7) leakage adhesive or glue method is improper.
When occurrence quality problem, should be aimed at afore-mentioned
reasons by adjusting process parameters or not and make a record,
while adjusting the number of parameters or process, otherwise the
quality the real cause of the problem is difficult to identify, but
also difficult to formulate and adjust the production environment
and technology standards to provide the objective basis.
国家: | China |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | T/T, L/C, D/P, Western Union, Money Gram, PayPal, Other |
產品組 : | - |