联系人 Ms. Ivanka
Shenzhen, Shenzhen, Guangdong
一、Core Business
Plastics injection moulds building
Pre & mass production of plastic parts
二、Project management system
A.Part Analysis, When we receive the 3D data, we will start the
part analysis, show the gate position, parting line, potential
concerns, etc. on the 3D drawing.
B.Mold Specification Sheet. After we receive the purchasing order,
we will make the mold specifications as per your mold requirements,
then send it to the client for confirmation. It is better if
the customer can provide us with specifications and mold
manufacturing standards.
C.Mold drawings. We will design the 2d drawing first when get the
confirmation of the mold specifications, then the 3D mold drawing
will be provided.
D.Tooling schedule. The tooling schedule will be provided after
getting the confirmation for the steel cutting. This schedule will
be updated on every Monday following, along with detailed noted
projects of the process with photos.
E.First article inspection report. This will be provided after the
mold trial, and also with the video and pictures showing the mold
running status and samples status.
F.Before mold shipping. We will provide the checking list, which
includes all the items which need to be confirmed before mold
shipping, along with the pictures.
国家: | China |
型号: | - |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |