看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
SA178 Gr.A - Electric-Resistance-Welded Carbon Steel And Carbon-manganese steel boiler and superheater tubes
Next

SA178 Gr.A - Electric-Resistance-Welded Carbon Steel And Carbon-manganese steel boiler and superheater tubes

离岸价格

获取最新报价

( Negotiable )

|

15 Ton Minimum Order

国家:

China

型号:

HC201404-1

离岸价格:

( Negotiable ) 获取最新报价

位置:

China

最小订单价格:

-

最小订单:

15 Ton

包装细节:

bundle.case

交货时间:

45-55days

供应能力:

6000 Ton per Month

付款方式:

L/C, T/T

產品組 :

-

现在联系
免费会员

联系人 Mr. Khu

People Road, Suzhou, Jiangsu

现在联系

产品规格

  • Standard: ASTM A178/ASME SA178
  • Grade: Gr.A, Gr.C, Gr.D
  • Thickness: mm
  • Section Shape: Round
  • Application: Boiler Pipe
  • Technique: ERW
  • Certification: ISO
  • Surface Treatment: other
  • Special Pipe: other
  • Alloy Or Not: Non-alloy
  • length:22m

详情

1) A**8 Chemical Component Analysis(%): 

     Gr. A: C: 0.***0.*8;  Mn: 0.***0.*3;   P: Terry(Chief Business Executive Officer) 

Email:  *@********************



Commercial Information:

  1) Delicery time: *5 days ready at mil also according to the actual weight ;  

  2) Minium order : *5 Ton/Dimension while not stock raw material; 

  4) Term of payment     :  T/T or L/C at sight; 

  5) Delivery Port              :  Shanghai Port ;

  6) Offer Validity              :  7 Days        ;

  7) Container                   :  *0GP or *0GP or Bulk ;

  8) Manufacture methods  :  ERW method.

国家: China
型号: HC201404-1
离岸价格: ( Negotiable ) 获取最新报价
位置: China
最小订单价格: -
最小订单: 15 Ton
包装细节: bundle.case
交货时间: 45-55days
供应能力: 6000 Ton per Month
付款方式: L/C, T/T
產品組 : -

Send a direct inquiry to this supplier

至:

Mr. Khu < Jiangsu Huacheng Industry Pipe Making Corporation >

我想知道: