看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Scaffolding Metal Board/Plank
Next

Scaffolding Metal Board/Plank

离岸价格

获取最新报价

1.5 ~ 10.5 USD / Piece

|

300 Piece Minimum Order

国家:

China

型号:

-

离岸价格:

1.5 ~ 10.5 USD / Piece 获取最新报价

位置:

-

最小订单价格:

1.5 per Piece

最小订单:

300 Piece

包装细节:

in pallet or as your request

交货时间:

10 to 20 days

供应能力:

-

付款方式:

T/T, L/C, D/P

產品組 :

-

现在联系
免费会员

联系人 Ms. Maggie

NO.9 Xiangfu Middle Road, Changsha, Hunan

现在联系

产品规格

  • finish:Q235 hot-dipped galvanized

详情

Product Description
World galvanized steel plank is an ideal economical & eco-friendly scaffolding solution for scaffolding system and formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
 
Advantages:
1. Better Side box design with better anti - deforming capability
2. Strengthen support designs with much stronger support force
3. **0mm support spacing with better anti - deforming capability
4. Hot dip galvanizing surface & lifespan > 5 years
5. Punching design to anti-skid & lighten weight
6. Stiffener design to reinforce the load bearing capacity

Product Specification
Width(mm) Height(mm) Plate Thickness(mm) Length(mm)
**5 *5 1.**2.5 *******0
**0 *5 1.**2.5 *******0
**0 *0 1.**2.5 *******0
**0 *0 1.**2.5 *******0

Our Services
**0% satisfaction guarantee
1. Solve your problems within *4 hours
2. Your feedback is highly valued
3. Update price and new products regularly

FAQ
1. Are you the manufacturer or trader?
We are **0% manufacturer,specializing in scaffolding over *3 years.There are excellent engineers make designs and skillful welding workers.
 
2. What are the most important factors that influence on the quality of frame scaffold?
There are the material type, the sizes of tube, and the surface treatment.
 

国家: China
型号: -
离岸价格: 1.5 ~ 10.5 / Piece 获取最新报价
位置: -
最小订单价格: 1.5 per Piece
最小订单: 300 Piece
包装细节: in pallet or as your request
交货时间: 10 to 20 days
供应能力: -
付款方式: T/T, L/C, D/P
產品組 : -

Send a direct inquiry to this supplier

至:

Ms. Maggie < Hunan World Scaffolding Co., Ltd. >

我想知道: