联系人 Ms. linda
185#,299xiangjiang RD, suzhou, Jiangsu
Steel box seal
machine
Reduction gears
If you use it in first time,*4 hours later, you need to change the lubricating oil and clean the machine. After that, please change the lubricating old every *******0hours
Power: **0V
Must connect with the earth wire!!
Lubricating oil
㈠temperature more than 5°~*8°*0#lubricating oil
㈡less than 5°~0°,please use5# lubricating old
Preparation before than starting of the machine
㈠you need to add in the joints **4 times
㈡the plunger need to add the lubricating oil **6times
Adjustment
①adjust the mould core
②adjust the space between upper &under shovel board and the mould core to about 1.5~2.5mm
③adjust the space between right &left shovel board and the mould core to about 0.5~mm
④adjust the backer for putting the steel sheet to make sure it is in the middle. And make sure the two sides of the sheet are not too tight.
⑤check the right &left shovel board with the gate are well are not
⑥check the pressure head are pressing the tightly or not
⑦After the steel box are out, check whether the are flat in right and left. Adjust the screw are good or not
⑧If the pressure head are not in the middle of the gate, you can unscrew the 4 screws of the planker and then adjust it.
⑨Please pay attention to the cleaning of the joints and outside parts
国家: | China |
型号: | php-009 |
离岸价格: | 获取最新报价 |
位置: | - |
最小订单价格: | - |
最小订单: | - |
包装细节: | - |
交货时间: | - |
供应能力: | - |
付款方式: | - |
產品組 : | - |