看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
stainless steel cutlery set
Next

stainless steel cutlery set

离岸价格

获取最新报价

20 ~ 35 / Set ( Negotiable )

|

500 Set Minimum Order

国家:

China

型号:

-

离岸价格:

20 ~ 35 / Set ( Negotiable ) 获取最新报价

位置:

-

最小订单价格:

20 per Set

最小订单:

500 Set

包装细节:

72pcs in a wooden box, 2 boxed in a carton

交货时间:

30-45 days for OEM, 7-10 days for stock products

供应能力:

-

付款方式:

T/T, L/C, Western Union, PayPal

產品組 :

-

现在联系
免费会员

联系人 vincent

Guangzhou, Guangdong

现在联系

产品规格

  • Material: Metal
  • Certification: FDA
  • Feature: Eco-Friendly
  • Polish:mirror polish
  • Package:2 wooden box in a carton
  • OEM&ODM:Available
  • Advantage:Low price & Fast delivery

详情

 What is the details of the gold plated *2pcs cutlery set ?                                           
 

Name

 

 


*2pcs cutlery set
 

Material

 

Stainless steel **4/**0/**1/**0

Quality  

SS**0(*8/0),SS**4(*8/*0) can pass LFGB,SGS,FDA

 

Surface finish

 

Mirror polish

 

Color

 

Silver or gold

 

Logo

 

Stamping,Lasering,Etching,etc

 

Packing

 

Bulk/color box/according to your request

Qty in Carton *2pcs in a wooden box, 2 boxes in a carton
 

EXP.CTN SIZE

 

*0**0**1cm

 

Sample lead time

 

Within 3 days

 

Product Features

 

1.Rust-resistant

2.Easy cleaning and washing

3.Fashional and modern design

4.Suitable for home,hotel and restaurant

 

5.Dishwasher safe

 

what is the specification of the gold plated *2pcs cutlery set?                                  

  material thickness dimensions weight contain
dinner spoon **0 2.8 **6×*0 *1 *2
dinner fork **0 2.8 **7×*7 *1 *2
tea spoon **0 2.5 **0×*6 *8 *2
tea fork **0 2.5 **3**2 *4 *2
dinner knife **0 5 **2×*0 *2 *2
serve spoon **0 3 **8×*1 *5 2
meat fork **0 2.5 **7×*5 *9 2
salad fork **0 3 **1×*6 *5 1
salad spoon **0 3 **0×*6 *9 1
soup spoon **0 2.5 **9×*2 *4 1
cake serve **0 2.5 **0×*7 *2 1
ice cream spoon **0 2.5 **5×*7 *1 1
ladle spoon **0 2.5 **6×*8 **3 1
ladle spoon2 **0 2.5 **8×*6 *6 1
sugar picker **0 1 **2×*6 *9 1

  Packaging & Shipping ,Trade Terms:                                                                               

 
Shipping 
 

1. FedEx/DHL/UPS/TNT for samples, Door-to-Door

2. Customers specifying freight forwarders or negotiable shipping methods

3. Delivery Time: **7 days for samples; ****5 days after sample approval

 
 
 
Payment Terms
 
1. Payment: T/T, *0% deposits; *0% balance before delivery.
 
 why choose us?                                                                                                                    1. About ***0 square meter standard workshop
 
 
 

2. About **0 experienced workers at peak time

 

3. *3 years manufacture's warranty

 

4. **0% QC inspection before shipment

FAQ                     
 
                                                                                                                                      
Q ARE YOU FACTORY OR TRADER?

A: Besta Stainless Steel is a manufacturer located in Jieyang.

Q: HOW TO GET A SAMPLE?

A: For existing samples, it takes **2 days. They are free if freight collected.

     For your own designs, it takes ***4 days, subject to your designs whether they need new printing screen, etc.  

Q: DO YOU ACCEPT OEM?

A: We accept OEM & ODM, and we accept low MOQ.

Q: WHAT FORMAT OF THE FILE DO I HAVE TO OFFER IF I WANT MY OWN DESIGN?

A: We have our own designer. So you can provide JPG, AI or PDF, etc. We will draw artwork for mold or printing screen for your final confirmation based on technique.

Q: HOW LONG IS THE PRODUCTION LEAD TIME?

A:It takes ****0 days for MOQ. We have large production capacity, which can ensure fast delivery time even for large quantity.

Q: HOW TO VISIT YOUR FACTORY?

A: Most of the main cities have flight to Jieyang; you can take flight to Jieyang Chaoshan International Airport.

 
  • If you come from Guangzhou, it will take 1 hour by flight (every day 5 flights), or 6 hours by bus.
  • If you come from Shanghai, it will take 2 hours by flight (every day 5 flights).
  • If you come from Yiwu or Ningbo, it will take about 1.5 hours by flight.If you come from Hongkong, it will take 1 hour by flight (every day 1 flight around noon time).

国家: China
型号: -
离岸价格: 20 ~ 35 / Set ( Negotiable ) 获取最新报价
位置: -
最小订单价格: 20 per Set
最小订单: 500 Set
包装细节: 72pcs in a wooden box, 2 boxed in a carton
交货时间: 30-45 days for OEM, 7-10 days for stock products
供应能力: -
付款方式: T/T, L/C, Western Union, PayPal
產品組 : -

相关产品 Jieyang Besta Stainless Steel Products F

Send a direct inquiry to this supplier

至:

vincent < Jieyang Besta Stainless Steel Products F >

我想知道: