离岸价格
获取最新报价10 USD / Square Meter
|20 Square Meter Minimum Order
国家:
China
型号:
FGM03
离岸价格:
10 USD / Square Meter 获取最新报价
位置:
Fujian,China
最小订单价格:
10 per Square Meter
最小订单:
20 Square Meter
包装细节:
carton with pallet
交货时间:
in 25 days
供应能力:
10000 Square Meter per Week
付款方式:
T/T, L/C, Western Union, Money Gram, PayPal
產品組 :
联系人 Ms. Becky
Fengze, Quanzhou, Fujian
requirements. Natural texture and external clay color collect architectures rich artistic style.
6.Diversity Styles and Sizes
Leiyuan offers a variety styles and sizes for your chosen, its complete sizes through different product combination and cutting to meet designer’s style requirement
************************************************************************************************-
Terracotta Panel Installation Steps:
1.Measurement and line laying
Using a leval to mark the horizontal and vertical lines for mounting supporting poles
2.Installation of Columns
Secure columns on the main structure with brackets and stainless stell bolts, adjust the verticality of the supporting columns
3.Installation of brackets or supporting rails
Secure them on the columns with stainless steel bolts or screws, adjust the verticality and horizontality of the columns
4.Installation of terracotta panels
1) Apply the adhesive tapes on supporting rails or columns as the joint pieces
2) Position terracotta panels and clamps, adjust the verticality and horizontality of the terracotta panels by clamps
3) Mount panels from bottom up to finish the installation
5.Apply sealant
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels
6.Cleanup of the Curtain Wall
Clean the installed terracotta
panels with water
requirements. Natural texture and external clay color collect
architectures rich artistic style.
6.Diversity Styles and Sizes
Leiyuan offers a variety styles and sizes for your chosen, its complete sizes through different product combination and cutting to meet designer’s style requirement
************************************************************************************************-
Terracotta Panel Installation Steps:
1.Measurement and line laying
Using a leval to mark the horizontal and vertical lines for mounting supporting poles
2.Installation of Columns
Secure columns on the main structure with brackets and stainless stell bolts, adjust the verticality of the supporting columns
3.Installation of brackets or supporting rails
Secure them on the columns with stainless steel bolts or screws, adjust the verticality and horizontality of the columns
4.Installation of terracotta panels
1) Apply the adhesive tapes on supporting rails or columns as the joint pieces
2) Position terracotta panels and clamps, adjust the verticality and horizontality of the terracotta panels by clamps
3) Mount panels from bottom up to finish the installation
5.Apply sealant
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels
6.Cleanup of the Curtain Wall
Clean the installed terracotta panels with water
国家: | China |
型号: | FGM03 |
离岸价格: | 10 / Square Meter 获取最新报价 |
位置: | Fujian,China |
最小订单价格: | 10 per Square Meter |
最小订单: | 20 Square Meter |
包装细节: | carton with pallet |
交货时间: | in 25 days |
供应能力: | 10000 Square Meter per Week |
付款方式: | T/T, L/C, Western Union, Money Gram, PayPal |
產品組 : | floor and wall tiles |