看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
zozen SZS new steam gas-fired(oil-fired) hot water industrial boiler factory china zozen SZS new steam gas-fired(oil-fired) hot water industrial boiler factory china zozen SZS new steam gas-fired(oil-fired) hot water industrial boiler factory china zozen SZS new steam gas-fired(oil-fired) hot water industrial boiler factory china zozen SZS new steam gas-fired(oil-fired) hot water industrial boiler factory china
Next

zozen SZS new steam gas-fired(oil-fired) hot water industrial boiler factory china

离岸价格

获取最新报价

|

1 Unit Minimum Order

国家:

China

型号:

SZS25-2.5-Q.Y

离岸价格:

获取最新报价

位置:

china

最小订单价格:

-

最小订单:

1 Unit

包装细节:

container

交货时间:

30-45 days

供应能力:

200 Unit per Month

付款方式:

Western Union, D/P, L/C, T/T

现在联系
免费会员

联系人 Ms. lena

No.76Xinda road ,fenshui,zhoutie town,Yixing city, Wuxi, Jiangsu

现在联系

产品规格

  • Product thermal capacity:10-50 t/h
  • Working pressure:1.25-2.5 Mpa
  • Outlet temperature:194-225

详情

 
Introduction
 
 

SZS series boiler is designed with longitudinal double drums and " D " type chamber structure. The furnace is on the right and convection tube bank is on the left. The body is fixed on the basement by middle and both end flexible supports and make the boiler expand horizontally sideways. Around the furnace is membrane wall. Furnace and tube bundle are totally separated by the membrane wall at the left side of the furnace. The back part of convection tube bank is sparse shift structure, front part is aligned structure. Smoke from furnace outlet enters re-burning chamber, convection tube bank area, and then from left front part enters spiral fin coil economizer and condenser, and finally is discharged to atmosphere through chimney.
 
 
Technical advantages
 
 
 
Digitized manufacture
 
  • Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization; The explosion door and flame detector are equipped for safe and reliable operation. Comb plates are used between both sides of boiler and tube bundle to avoid leakage of condensate and gas caused by using refractory concrete as sealing material. Air proof test is done before delivery in the factory to guarantee any gas leakage problem.
 
Environment-friendly
 
  • Big combustion chamber equipped with Low emission combustion burner effectively reduce the NOx to *0mg/m3. Smoke duct and smoke outlet use internal insulation to reduce operating noise.
  • Combustion chamber uses full membrane water cooling wall structure and pressurized combustion without smoke mixture.
 
Energy-saving
 
  • Good quality alumina silicate fiber and fire clay insulation material are used and the boiler body temperature is controlled below *5℃ and greatly heat loss is reduced. Combustion chamber is designed with narrow distance tube membrane water cooling wall which has good air proof to reduce heat lost and increase boiler thermal efficiency. Internal inspection holes uses high-alumina refractory and manhole cover seal devices, solving superheat problem in this part caused by using refractory bricks.
 
Convenience
 
  • Manholes are placed on the front and back side of drums and inspection doors on back side of boiler easy to open for inspection and clean inner and outer parts.
 
Longer working life
 
  • Membrane structure are used in the front and back wall for boiler body and highly increased their lifespan to over *0 years.
  • The key processes including material cutting, rolling, drilling are done by advanced CNC machining process to reduce the assembly stress and extend boiler service lifetime.
  • Flutter prevention fastener is used for high temperature part convection tubes, which avoid convection tube cracking problem.
  • Longitudinal and girth joint adopt advanced automatic submerged-arc welding for good welding quality. All longitudinal and girth joint will be tested by radio graphic inspection.

国家: China
型号: SZS25-2.5-Q.Y
离岸价格: 获取最新报价
位置: china
最小订单价格: -
最小订单: 1 Unit
包装细节: container
交货时间: 30-45 days
供应能力: 200 Unit per Month
付款方式: Western Union, D/P, L/C, T/T
產品組 : Gas-fired boilers

Send a direct inquiry to this supplier

至:

Ms. lena < Wuxi Zozen Boilers Co., LTD >

我想知道: