Dominican Republic
联系人 Mr. Carlos
27 de Febrero, Santo Domingo
SEVEN FOOTER DOUBLE BARREL ASTEC PLANT ****2 TONNAGE PRODUCED *6, **0TONNNES. NEW IN ***5. PRODUCTION CAPACITY **0 TPH. MADE WITH PRIDE IN AMERICA FOR ASTEC INDUSTRIES. M-PACK MODEL. our plant has TWO *0, **0 gls AC tank, the recycling system that originally cost **5, **0.*0, and the lime-cement silo with all the related equipment according to osha standards. Also we have five (5) cold feed bin silos for added production. The additional AC tank, the five cold feed bin silo, the two **0 ton HMA silos, mean to have the capacity to double the production of the other plant you mentioned. Also the recycling system is a must. The dry admixture system also allow theproducer to make more stable and durable mixes. TECASSA made the asphalt pavement of the Sto Dgo. *7 de Febrero Avenue of six lanes in *****7 adding 2% Portland cement to the HMA, and the pavement is in very good working condition after *1 years. It will last for another ten years or more. ********************************************************************** All the transportation costs are on the buyer. The plant is in Santo Domingo, Dominican Republic
国家: | Dominican Republic |
型号: | M-Pack |
离岸价格: | 1300000 / 获取最新报价 |
位置: | Santo Domingo, Dominican Republic |
最小订单价格: | 1300000 |
最小订单: | 1 |
包装细节: | - |
交货时间: | - |
供应能力: | 1 |
付款方式: | - |
產品組 : | - |