看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Acrylic acid badminton court
Next

Acrylic acid badminton court

离岸价格

获取最新报价

|

1000 Kilometer Minimum Order

国家:

China

型号:

AC-Y

离岸价格:

获取最新报价

位置:

guangzhou

最小订单价格:

-

最小订单:

1000 Kilometer

包装细节:

5 Gallon/barrel, 55 Gallon/barrel or packing as the customer's like

交货时间:

7 days after deposit

供应能力:

8 Ton per Day

付款方式:

T/T, Western Union

產品組 :

-

现在联系
免费会员

联系人 tannie

jiang gao, Guangzhou, Guangdong

现在联系

详情


Acrylic acid badminton court

1. Required Materials
   The materials used for the   ColorPlus System for Concrete Substrate are as follows:
   Primer
   Level Master
   Coat
   For detailed products information consult the individual Specifications.
2.Application of Primer
  It is suggested to apply only 1 coat of Primer.
  The undiluted coverage rate is approximately 0.*5kgs per square meter,per coat.
  The practical quantity depends on the smoothness of the surface.
3.Application of Level Master
  It is suggested to apply minimum 2 coats of   Level Master.
  The undiluted coverage rate is approximately  0.*5kgs per square meter, per coat.
  The practical quantity depends on the smoothness of the surface and the different sizes      of the added sand. 
4.Application of Coat
  the previous two coats is incorporated with sand (texture coat), the third coat can be       applied directly (finish coat).
  The undiluted coverage rate for the texture coat is approximately added with sand: 0.2kgs    per square meter, per coat, added with   Base: 0.**6kgs per square meter, per coat, while    the undiluted coverage rate for the finish coat is approximately 0.*5kgs per square          meter, per coat.
  The practical quantity depends on the different sizes of the added sand. 
5.Application of Line Paint
  It is suggested to apply 1 coat of Line Paint.
  Approximately 3.*5kgs is needed for a standard tennis court.
6.Completion
  Courts can only be put into use after *4 hours when the work comes to an end.
  Upon completion, the constructor shall insure proper removal of all construction debris, 

  surplus materials, empty containers and wash water, and shall leave the site in a   condition     

  acceptable to the owners.
  The court is to be left secure so as to prevent vandalism.

国家: China
型号: AC-Y
离岸价格: 获取最新报价
位置: guangzhou
最小订单价格: -
最小订单: 1000 Kilometer
包装细节: 5 Gallon/barrel, 55 Gallon/barrel or packing as the customer's like
交货时间: 7 days after deposit
供应能力: 8 Ton per Day
付款方式: T/T, Western Union
產品組 : -

Send a direct inquiry to this supplier

至:

tannie < GuangZhou jin hong sport equipments co., ltd >

我想知道: