1. Required Materials
The materials used for the ColorPlus
System for Concrete Substrate are as follows:
Primer
Level Master
Coat
For detailed products information consult the
individual Specifications.
2.Application of Primer
It is suggested to apply only 1 coat of Primer.
The undiluted coverage rate is approximately 0.*5kgs per
square meter,per coat.
The practical quantity depends on the smoothness of the
surface.
3.Application of Level Master
It is suggested to apply minimum 2 coats of
Level Master.
The undiluted coverage rate is approximately 0.*5kgs
per square meter, per coat.
The practical quantity depends on the smoothness of the
surface and the different sizes of
the added sand.
4.Application of Coat
the previous two coats is incorporated with sand (texture
coat), the third coat can be
applied directly (finish coat).
The undiluted coverage rate for the texture coat is
approximately added with sand: 0.2kgs per
square meter, per coat, added with Base: 0.**6kgs per
square meter, per coat, while the undiluted
coverage rate for the finish coat is approximately 0.*5kgs per
square
meter, per coat.
The practical quantity depends on the different sizes of
the added sand.
5.Application of Line Paint
It is suggested to apply 1 coat of Line Paint.
Approximately 3.*5kgs is needed for a standard tennis
court.
6.Completion
Courts can only be put into use after *4 hours when the
work comes to an end.
Upon completion, the constructor shall insure proper
removal of all construction debris,
surplus materials, empty containers and wash water, and shall leave the site in a condition
acceptable to the owners.
The court is to be left secure so as to prevent vandalism.
国家: | China |
型号: | AC-3 |
离岸价格: | 获取最新报价 |
位置: | guangzhou |
最小订单价格: | - |
最小订单: | 1000 Kilometer |
包装细节: | 5 gallon/barrel, 55 gallon/barrel |
交货时间: | 7 days after deposit |
供应能力: | 8 Ton per Day |
付款方式: | T/T, Western Union |
產品組 : | - |