离岸价格
获取最新报价2600 USD / Ton
|1 Ton Minimum Order
联系人 Mr. George
No 7 Yun er Road Baiyun Industrial District, Yongkang, Zhejiang
Aluminium tube profile
1.RoHS,ISO***1,ISO****0
2.Casting ,extrusion,CNC(milling),anodized
3.Material:A****1,A****3
Aluminium tube profile
1)
Alloy***1,***3,***3B,***0,***5,6N*1
2) Alloy chemical element profile
Alloy |
Si |
Mg |
Fe |
Cu |
Mn |
Zn |
Cr |
Ti |
***3 |
0.**0.6 |
****0.9 |
<0.*5 |
<0.1 |
<0.1 |
<0.1 |
<0.1 |
<0.1 |
***1 |
0.**0.8 |
0.**1.2 |
<0.7 |
0.***0.4 |
0.*5 |
0.*5 |
0.***0.*5 |
<0.*5 |
***3B |
0.**0.6 |
****0.9 |
<0.*5 |
<0.1 |
<0.1 |
<0.1 |
<0.1 |
<0.1 |
***0 |
0.**0.6 |
0.***0.6 |
0.1 |
0.1 |
<0.1 |
0.*5 |
0.*5 |
0.1 |
***5 |
0.**0.9 |
0.**0.6 |
0.*5 |
0.1 |
0.1 |
<0.1 |
<0.1 |
<0.1 |
6N*1 |
0.**0.9 |
0.**0.8 |
<0.*5 |
<0.*5 |
<0.5 |
<0.*5 |
<0.3 |
<0.1 |
3) TemperT*-T8
4) Surface Treatment
1.drilling 2.tapping 3.punching 4.wiredrawing 5.sand blasting 6.milling 7.polish
8.cutting 9.straightener *0.anodized
4)Anodized Colour:silver, red, champagne, black, blue, bronze and so on.
5)Machining procedure:die casting ,make mould,extrusion ,CNC (milling finish),cutting,anodized
6) Factory, Employee, Capacity
1 Date of foundyear ***3
2 Factory areacover an area more than *8,**0 sq.m.
3 Employee:More than **0 employee, & more than *0% of them technologists.
4 Machine & Capacity
Extrusion line*8 set of *******0tons imported extrusion lines, annual output capacity is more than *0,**0 tons.
b)Processing machine*8 production line .*5 sets of imported CNC lathe,*0sets of punching,drilling,tapping machines,with more than *6,**0 product apply in electronic ,building,machinery,automobile,camera monitor etc .
c)Advance test equipment and lab spectrometric analyzer, metallurgical analyzer, imported projector measuring instrument, Rockwell hardness meter, clamp type hardness meter, desk type hardness meter, eddy-current film tester, colorimeter, electron microscope and so on
7)CertificatesISO ***1:***0 ISO ****1:***4 and comply by ROHS
7) Terms & Conditions of Trade
1). Payment termT/T, *0% down payment, & the balance to be paid off before delivery.
2). Settlement termcharge by final actual weight or by theoretical weight as per drawings.
3). Delivery date
a). Die/Mould7 to *0 days after down payment & drawings are confirmed.
b). Goods: *5 days after sample confirmed & down payment.
c).Packagestandard export packing like kraft paper or carton box or pallet or according to
client request .
国家: | China |
型号: | AM-01 |
离岸价格: | 2600 / Ton 获取最新报价 |
位置: | China |
最小订单价格: | 2600 per Ton |
最小订单: | 1 Ton |
包装细节: | standard export packing like kraft paper or carton box or pallet or according to client request |
交货时间: | 15 days |
供应能力: | 2500 Ton per Month |
付款方式: | Other, Western Union, L/C, T/T |
產品組 : | Hardware |