离岸价格
获取最新报价|
Minimum Order
位置:
-
最小订单价格:
-
最小订单:
-
包装细节:
-
交货时间:
-
供应能力:
-
付款方式:
-
Turkey
联系人 Mr. adem
Alanya, Antalya
HYDROELECTRIC HEPP PROJECTS FOR SALE Province : a1 TURKEY Installed Power (MW) : *7.*9 Annual Generation (GWh) : *9.*7 Flow Rate (m3/sec) : 3.*0 Net Head (m) : **6.*4 Total Investment (Million TL) : *8, **7, **8 usd Conveying Channel (m) : **7 Energy Transmission Line (m) : *2.*0 km Unit Generation (GWh/MW) : Invest. Per Unit Gener. (TL/kWh) : Water Usage Tax (Kr/kWh) : 1.*9 Licensing Stage : Licensed