离岸价格
获取最新报价|
Minimum Order
位置:
-
最小订单价格:
-
最小订单:
-
包装细节:
-
交货时间:
-
供应能力:
-
付款方式:
-
联系人 Ms. Anna
Liushi Town, wenzhou, Zhejiang
Application and Sort 1.Application: This series electric switch cabinet, are suitable for the tower crane which mainly usded in skyscraper , reservoir dam , power plant , etc. Can control cranes in starting , timing, braking and reversing the motors. ***** of work: (1)The height above sea level does not exceed ***0 meters ; (2)The temperature of medium around is not higher than **0 degrees Centigrade , is not lower than - *0 degrees Centigrade; (3)The relative humidity does not exceed *5% ; (4)The medium around has not exploded dangerously, there is no conductive powder and can destroy such places as the insulating corrosivity gas , etc. ; (5)Protect the grade and adopt IP*4 , IP*5. ***** name of one kind of groups: QT- tower crane Pattern, characteristic code name: Z - is it is it rise tower machine , X - lay person who turns tower round , S - is it is it rise tower machine , K - install the tower machine , G - the regular type tower fast by oneself to turn round to lay by oneself to turn round to go to Classify: Switch board (case ) this according to related tower machine blow gravity square with can divide for xxxxx , xxxxx , xxxxx , xxxxx , xxxxx , xxxxx , xxxxx, xxxxx , xxxxx, xxxxx, 1xxxxx, 1xxxxx, when more than ten kinds of specifications. xxxxx This electric switch board adopted standard of GB******8 " technological condition of the tower crane ", the shell should be made curved with the stencil plate , according to the needs of users**9; reality, can make into different external dimension and size of installation . Install way adopt hanging type or base type , inside electric component its can select different products of type for use, for instance the contactor can select series of Model CJ*0 , LC1 series , B series , etc. for use , can also select for use and import the component . xxxxx This serial electric switch boards cooperate with hoist control cabinet, one that is to tower crane is it rise , turn round to get up, car become piece , starting , reversing is it control to transfer the speed , apply the braking that cart walk, realize distribution of supporting , short out , pass electric current , overvoltage , owe voltage , zero , disconnected phase , equal to protecting to hoist by mistake. Serial electric switch board this adopt vortex brake and switch over electrical machinery rotor way that resistance combine together go on speed of transfering, is it transfer speed or coupling is it step down starting is it switch over resistance transfer speed , electromagnetic to transfer to difference transfer speed , moment electrical machinery transfer the speed to add to vary voltage very much to become, can adopt frequency conversion to adjust speed and PLC control method . Each sport organization in the tower machine can adopt different adjusting the speed way .