离岸价格
获取最新报价|
Minimum Order
位置:
-
最小订单价格:
-
最小订单:
-
包装细节:
-
交货时间:
-
供应能力:
-
付款方式:
-
联系人 Mr. David
Yangshe Town, zhangjiagang, Other
1) Time and power saving can be reach to *7% - *5% 2) Can be connected to material entrance of main machine directly, avoiding Drying plastic granule**9;s two times moisture absorption 3) Has excellent dry effect 4) Enhances quantity of finished product