Today, more
and more tents are used in corporate activities. Many companies
will choose to purchase and rent tents for temporary use, but the
construction of large tents has stumped many companies. Today I
will share the tents for everyone Tutorials and
notes! The first
step: setting up on-site lofting and fixed
base According to
the specifications and size of the tent used, the overall tent
construction is laid out. First set out at the construction site,
all the base chassis must be on a horizontal line. Determine the
position of all the bases, and then fix the bases after
confirmation! Step 2:
Place the materials With
reference to the installation instructions, the materials of each
component will be placed at the joint of the corresponding assembly
according to the connection relationship and construction position
of each component. Step 3:
Combine the framework 1.
Installation of ridge connection angle and inclined beam: insert
the ridge connection angle into the left and right inclined beams,
and then fasten with bolts 2.
Installation of load-bearing columns and inclined beams: After
assembling the load-bearing columns and inclined beams to the
holes, fasten with bolt 3.
Installation of the load-bearing column and the base: align the pin
holes of the load-bearing column built-in parts and insert the
cylindrical pin, and then lock with the opening lock, and so on,
all the connection and installation are completed on both
sides Step 4:
Erect the frame Install the
two lifting belts on the inclined beam separately, and use the
traction equipment (such as a crane) to rectify the first group of
frames through the correct and safe link of the traction
contraction and the inclined beam. The other side must have a
reverse pull rope. Prevent excessive traction and
anti-dumping. Step 5:
Install eaves and roof square pipes Hang the end
of the eaves square tube with the hook first into the U-shaped
buckle of the erected frame, and then lift the other end with a
fork rod to hang into the corresponding U-shaped buckle (note: the
left and right sides need to be correspondingly), and then use the
same The method of hanging all the eaves and roof square
pipes. Step 6:
Install the center column and side column of the
gable Align the
inner corner of the gable with a right angle upward and the
cylindrical hole on the connection angle of the roof ridge, and
link it with bolts. The bottom end should be connected to the base,
locked with a cylindrical pin, and then install the weight column
in the same way (note: the base should not be fixed first). After
installation, adjust the center and side columns according to the
flatness of the construction site. When the parallel and stable
state is maintained, the base is fixed! Finally, as
long as the tarpaulin is installed, the tension rod is inserted
into the side groove under the side wall or gable tarpaulin, the
two sides are fixed on the base, and a comprehensive inspection is
completed to complete the tent
construction! After
reading the tutorial, do you think that tent construction is not a
simple matter, but professional things should be left to
professional people to do, choose Suzhou WT tent, we can provide
you with professional tent construction services!
contact: Jessica
Email: *@********************