看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Photovoltaic  Park

Photovoltaic Park

离岸价格

获取最新报价

|

Minimum Order

位置:

-

最小订单价格:

-

最小订单:

-

包装细节:

-

交货时间:

-

供应能力:

-

付款方式:

-

现在联系

Avoid Advisors

Portugal

免费会员

联系人 Mr. jose

rua araujo caranda 142, braga, portugal

现在联系

详情

Photovoltaic park: *5.**0 panels with an installed capacity of 2.**8 MW Contract already in place with EDP (Electricity of Portugal ) indefinitely. At the moment EDP pays 0.*2 euros a KWh what it does, today an average monthly turnover of *0.**0, *0 euros, with months more, some less. Annual turnover of **0.**0, *0 euros. Maintenance costs 2.5% of turnover. Rental of land where the park is installed, approximately *2.**0, *0 euros per year (it is indexed to billing). Time of useful life of the panels *5 years. After the first *5 years of the contract that, the EDP will pay a fee equal to normal. It is estimated that by that date of ⬠0.*0 a KWh. Operation cost 8.5 million euros. It is a profitable operation, because the yield ( *1.3 % ) The park is located at the south of Portugal. We estimate 2.**0 hours of sun annually. Greetings Costinha de Sousa

Send a direct inquiry to this supplier

至:

Mr. jose < Avoid Advisors >

我想知道: