Complete
PG***1B set, including main equipment and all auxiliary
equipment.
1.Turbine
is produced by France Aerstom Company PG***1B type
*7MW 2.
Foreign Control System (MARK 5) is in very good
condition 3.
Heavy Oil Treatment System by Germany ALFA-LAVAL Company. Total
flow *2m3/hr 4.
Complete special tool spare parts 5.
Complete files and drawings
First
Running: ********9; running stopped
on ********6 Running
hours: ****2 hours (fired HFO ****2 hours, diesel ***9
hours) Ignition
times: ***3 Overhauls:
3 times, first is *****1, second *****2, third is
*****1 Running
hours after the last overhaul: **1 hours Time
of last test operation: ********9
In
the last overhauls (***6), factory changed the nozzles, moving
blades and complex ring, etc.
After
********6, factory maintained the equipment every month, the most
important work is to turn the rotor *4 hours .