Components: skip body part, running part, thill part (forgeable
piece)
Application: Used in burden loading system
Usage: It is used on the vessel which loading to upper.
Size: 0.8m³~8m³
BF Capacity: *8m³~***0m³
The skip used for loading the burden for the blast furnace.
consisting of three parts: body, moving part, thill part.
The skip used for loading the burden for
the blast furnace, consisting of three parts, namely, the skip
body,the moving part and the thill part.Those which are less than
2.5m3are the parallel skip
bodies; those which are higher than 2.8 m3are the oblique kip bodies. The
bottom and the both sides inside the skip body are protected with
the abrasion-resistant liners, which are easy for the replacement.
There is a small hole in the upper side of the olique skip rear,
which is easy to charge the burden scattered in the pit withdraw
through the hole with manual work. Over 2 m3skips adopt the double-steel-rope
traction and the steel rope tension balanced device to make the two
steel ropes receive strength uniformly.