离岸价格
获取最新报价( Negotiable )
|Minimum Order
位置:
china(main land)
最小订单价格:
-
最小订单:
4 Unit
包装细节:
all house structure and fittings kept in shipping container
交货时间:
25 days after getting deposit
供应能力:
100 Unit per Month
付款方式:
T/T, L/C
联系人 Ms. JUN
number 555 at yonghe road, Nantong, Jiangsu
Floor and Base Frame
The building is erected on a concrete floor slab. A galvanized channel base frame is fixed to the concrete, under both external and internal walls.
Walls
The wall panels are screwed or riveted to the base channel and a similar wall frame connects the top of the panels. Meranti skirting is supplied.
Doors and Windows
The openings for doors and windows are lined with galvanized sections into which the door panels and windows are fixed. The windows are made from either aluminium or steel (which is either painted or galvanised depending on client requirements).
RoofElectrical Installation
This is supplied in kit form. Wall switches and plug boxes are flush mounted in the wall panel. The wiring cable is concealed in the polystyrene core. A fully equipped distribution board is supplied with each kit.
Plumbing Installation
Supplied in kit form using “Polycop” cold and hot water pipes and fittings. A floor mounted electric geyser is included.
Optional Extras