HDPESteel Plastic Coil Pipe
Production Line(Steel plastic Compound Pipe
Equipment)is the equipment specializing in
the production of model steel coil pipe(Steel Plastic Coil
pipe),The size it can produce is
:DN***0、DN***0、DN***0、DN***0、DN***0、DN***0、DN***0;Ring stiffness level
is::SN4/SN8、SN*0、SN*2.5、SN*6;
The
strap mould is compatible mold, pipe mould is compatible
winding cage,including***0~***0、***0~***0
two sets of compatible winding cage.
Steel Plastic Coil pipe is made from steel plastic compounded alien
strip that is according to spiral wound welding(faying surface
extrusion welding),The wall smooth level
off,specification is DN***-
DN***0mm。This pip is resistant to
corrosion、light weight、easy reliable
installation、the traffic
flow、long life(*0 years),Alternative high energy
consumption materials(cement, castiron, ceramics,
etc),green products of environmental
protection.
Model steel
composite abnormity strip adopt one method technology production
line,steel strip and molten plastic
finish two kinds of material compounded structure one time in the
compounded die head, After composite forming plastic steel
composite abnormity strip structure and size is stable, coated even
and neat.
Plastic steel composite abnormity strip has continuous high
production efficiency,the production process is stable
and reliable.
To ensure continuity of production strips,we set up special steel belt
supply device which can realize the continuous supply of steel
belt.
We set the cooling water temperature regulation control system and
many vacuum calibrating link,which can ensure the strip
production high efficiency and quality in different seasons.
Automatic control system can make steel belt
conveyor、plastic
extrusion、finished product drawing speed
unanimous.
Strip cooling system using circulating cooling water
system,cooling water consumption is very
low.
After putting in the volume and before coil pipe set the lifter
strips and lever,fully guarantee pipe winding
stability and reliable.
Equipment compact structure、easy to tear open outfit and
transportation;Equipment installation with no
need of anchor fixed,low demand on the site and
electric,can realize in the pipeline
construction site near production.