看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 立即加入 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell NTC long lead thermistor temperature sensors

Sell NTC long lead thermistor temperature sensors

离岸价格

获取最新报价

0.5 ~ 1 / Piece ( Negotiable )

|

Minimum Order

位置:

Guangdong, China

最小订单价格:

最小订单:

1000 Piece

包装细节:

1000pcs in a bag, then in box

交货时间:

2-15 days

供应能力:

50000 Piece per Week

付款方式:

T/T

现在联系
免费会员

联系人 Ms. Claire

Tanxia Industrial Zone, Mugang Town, Duanzhou District, Zhaoqing, Guangdong

现在联系

详情

NTC thermistor temperature sensors with special long insulated leads:

  • Features:
    • Fast time response for surface applications compared to standard NTC thermistors
    • End wire can be soldered, welded or crimped to a connector
    • Operating temperature range: **0 to ***5°C
    • High accuracy tolerances to ± 0.1°C (3‰)
    • PB-free
    • RoHS-compliance
  • Specifications:
    • Resistance range at *5°C: 5K to **0K ohms
    • Resistance tolerance: ± 3‰ (0.1°C) to *0%
    • Beta constant range: 3,**0 to 4,**0K
    • Beta tolerance: ± 1% & 2%
    • Rated power range at *5°C: *0 to *0mW
    • Dissipation factor range: 2 to 4mW/°C
    • Thermal time constant: *5 seconds
    • Epoxy resin coated, PVC wire or teflon wire
    • Special parameters could be customized
  • Widely used in battery pack for computer, home appliances and more

Send a direct inquiry to this supplier

至:

Ms. Claire < Exsense Electronics Technology Co., Ltd. >

我想知道: