看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell springs

Sell springs

离岸价格

获取最新报价

0.5 ~ 15 / Piece

|

Minimum Order

位置:

make in china

最小订单价格:

最小订单:

2000 Piece

包装细节:

carton

交货时间:

within 7 days

供应能力:

20000 Piece per Day

付款方式:

T/T, L/C

现在联系
免费会员

联系人 Mr. nana

No. 362, Shanfeng Street, Ciwu Town ,Zhuji City,, Shaoxing, Zhejiang

现在联系

详情

 

Specification

 

1) Many kinds available

2) Main material: *0Si2MnA, *5CrSi and other material alternative

3) Used in bonnell spring nets and spring mattresses

4) Main size: φ8 - *6.0mm

5) Top dia of spring: *****6mm

6) Height of spring:******0mm

 

Superiority

 


1. Zhejiang university heat treatment experiment base


2. China's largest brake springmanufacturer


3. The *0% domestic market share in brake spring.


5. Our company’s heat treatment technology measure up to advanced world standards by means of introducing Zhejiang University advanced heat treatment equipment. They’re the same as Japanese and Germany equipment.


6. High quality and competitive price


7. The Spring absorb shake and makedrive comfortably


8. The Spring resistance to both highand low temperature


9. High quality spring, everyproduct-spring needs to do many tests. For example, tensile strength, fatiguelifetime, static press, dynamometry salt mist and so on.ALTOKY TOYOTA COROLLASALTOKY TOYOTA COROLLASALTOKY TOYOTA COROLLASALTOKY TOYOTA CO

Terms and conditions

Sample lead time:**3days

Production lead time:**7days

Payment term: *5% prepaid before production, the balance should be paid before shipmentother payment terms can be discussed.

Shipping term: FOB, CIF or other shipping terms can be discussed

TS*6 **9, ISO***1TS****9

How to place an order

1.You send us your drawings or sample

2.We provide you an exact quote

3.When confirming our price, we prepare the first article

4.After confirming our sample, you place an order

5.Begin mass production after receiving *5% down payment

6.Deliver the goods after receiving the balance.T TS1 T ffffssOKY TOY TS****9, ISO***1 OTA COROLLASALTOKY

MOQ :***0PCS

 

Remarks:

ROLLAS Remarks: ALTOKY TOYOTA COROLLA

 

1 .MOQ:***0pcs (Negotiate)
2. Delivery time :within 7days
3. Payment terms:*0% prepaid before production, the balance should be paid before shipment
4. Warranty: 3 Months from the day when you receive the goods
 
If you have needs , Could you provide


your drawings?
 
1.Wire diameter (d)2.
2.Outside of diameter (O.D)
3.Free height
4.Active coil Number (Na)
5.material, quantity
 
Contact us asap .Thank


you.
S****9, ISO***1 ***9, ISO***1

Send a direct inquiry to this supplier

至:

Mr. nana < Zhuji Angke Spring Factory >

我想知道: