离岸价格
获取最新报价39000 ~ 45000 / Set
|Minimum Order
位置:
xinxiang henan china
最小订单价格:
最小订单:
1 Set
包装细节:
frame and container
交货时间:
15 days when we get 30% advanced
供应能力:
1 Set per Day
付款方式:
L/C, T/T
联系人 Mr. mike
dazhaoying, Xinxiang, Henan
The waste plastic /tyrepyrolysis plant consist of eleven parts:reactor,gas separator, water oil separator , cooling pool, condensor, oil tank , water seal , desulfurization deduster ,water film cyclone , draft fan , chimney.the output is crude oil,carbon black and steel wire.
1. About us
We are the manufacture which has specialized in this field for about *0 years. The plants can refine waste tyre/plastic/rubber to oil and other output.
1)working process:
Firstly , feed the raw material into furnace automatically or manually, then seal the feed inlet system.
secondly, heat the reactor by burning the fuel material(coal,or wood,or natural gas ,oil ) in the combustion system .
the reactor will slowly become heat ,when the temperature reach around **0 degree celsius, the oil gas will be formed.
After processed by our technology, the oil gas will go to cooling system for cold liquid oil.
the gas which can not become liquid under normal pressure , will be desinged to go back to combustion system through safety device instead of the fuel material to burn the reactor, which is environmental friendly and can save you much energy.
After finished oil produce ,the temperation of reacor will be down ,at the same time ,carbon black can be discharged automatically.
Lastly,when the temperature fall down to **0 degree celsius,worker could opened the door of reactor to discharge of steel wire
2)Main features :
Safety:
1. With an auto welding machine for the reactor, it can not only greatly improve working efficiency but also guarantee the quality of welding seam, thus avoid explosion caused by gas leak.
2. Professional heating treatment and x-ray detection chamber are especially for welding.
3. Vacuum system will prevent oil gas from going back to reactor and causing accident.
4. Professional thermometer, pressure gauge and safety valve.
5.It is dangerous to burn exhaust gas(C1 to C4) without any safety measures. In our process, it is transferred first through the safety device and a safety burning air muzzle. Before burning, we should ensure the safety of production.
Environment friendly:
1.Well water dedusting system can avoid black smoke.
2.The exhaust gas will be recycled for heating reactor, no gas pollution
3.Every junction of the reactor is in good sealing situation with professional sealing material.
Long service life:
1.Material: Q**5R special steel plate ,thickness *4mm.
2. Welding: Automatic welding machine with heating treatment and x-ray detection will prolong the service life of reactor to the max.
3. The service life of the reactor will be 8 **0 years
Energy saving:
1. Well sealing for heating system , no gas leak and saving fuel.
2. The exhaust gas will be recycled for reactor heating .
Company Commitment
The company pledge that each kind of series equipment we sell have the consummation the post-sale service,that thoroughly settle down customer extra worries.
Company:Xinxiang city Jinzhen Machinery Manufacturing Co.,Ltd.
Team No.**-V5:Chris,Anne,Mike
Phone?**6 **5 **6 ****3