看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 立即加入 |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Provide EMC/EMI/EMS test, LED lighting, LED driver, LED power supply EMC

Provide EMC/EMI/EMS test, LED lighting, LED driver, LED power supply EMC

离岸价格

获取最新报价

100 ~ 1000 / Piece ( Negotiable )

|

Minimum Order

位置:

Shenzhen China

最小订单价格:

最小订单:

1 Piece

包装细节:

EMC testing laboratory

交货时间:

1-2 weeks

供应能力:

1000 Piece per Week

付款方式:

T/T, PayPal

现在联系
免费会员

联系人 Mr. Edison

1F., Xingyuan Industrial Park, Tongda Road, Bao'an Blvd., Bao'an, Shenzhen, Guangdong

现在联系

详情


The EU electrical engineering market is the world's largest one (€**1 bn), followed by the US and Japan (€*6 bn and €*4 bn).

There are two main European Directives that apply to electrical and electronic equipment with respect to health, safety and performance: The Low Voltage Directive (LVD) ***6/*5/EC. The Electromagnetic Compatibility (EMC) Directive ***4/**8/EC.

Only EU notified body and EU National Cerification Bodies (NCB) can issue CE legally. For the products if CE mark abused, it should be subject to recall from the market immediately and the manufacturer or economic operators may be liable to a fine and, in some circumstances, imprisonment.

Manufacturer must establish the technical documentation and must keep it for a period ending at least *0 years after the last product has been manufactured.

Technical documentation must enable the conformity of the electrical equipment to the requirements of this Directive to be assessed. It must include:

- a general description of the electrical equipment;

- conceptual design and manufacturing drawings and schemes of components, sub-assemblies, circuits, etc.;

- descriptions and explanations necessary for the understanding of said drawings and schemes and the operation of the electrical equipment;

- a list of the standards applied in full or in part, and descriptions of the solutions adopted to satisfy the safety aspects of this Directive where standards have not been applied;

- results of design calculations made, examinations carried out, etc.;

- test reports.

The harmonized standards under Low Voltage Directive (LVD) ***6/*5/EC.

The applicable standards for common products within EMC Directive ***4/**8/EC as below.

HA & Power Tools EN ******1
EN ******2
EN ********2
EN ********3
 
Lighting EN ****5
EN ****7
EN ********2
EN ********3
IT EN ****2
EN ****4
EN ********2
EN ********3
AV EN ****3
EN ****0
EN ********2
EN ********3
RF ETSI EN **1 ****1
ETSI EN **1 ****3
ETSI EN **0 ****2
ETSI EN **0 ****2
GSM ETSI EN **1 ****1
ETSI EN **1 ****7
FCC
Medical CFR*7 Part *8
ANSI C*3.4
Appliances CF*7 Part *5B
ANSI C*3.4
RF CFR*7 Part *5
CFR*7 Part *0
CFR*7 Part *4
CFR*7 Part *5
HA & Power Tools
EN ******1
EN ******2
EN ********2
EN ********3
Lighting
EN ****5
EN ****7
EN ********2
EN ********3
IT
EN ****2
EN ****4
EN ********2
EN ********3
AV
EN ****3
EN ****0
EN ********2
EN ********3
RF
ETSI EN **1 ****1
ETSI EN **1 ****3
ETSI EN **0 ****2
ETSI EN **0 ****2
GSM
ETSI EN **1 ****1
ETSI EN **1 ****7
FCC
Medical
CFR*7 Part *8
ANSI C*3.4
Appliances
CF*7 Part *5B
ANSI C*3.4
RF
CFR*7 Part *5
CFR*7 Part *0
CFR*7 Part *4
CFR*7 Part *5
HA & Power Tools EN ******1
EN ******2
EN ********2
EN ********3
 
Lighting EN ****5
EN ****7
EN ********2
EN ********3
IT EN ****2
EN ****4
EN ********2
EN ********3
AV EN ****3
EN ****0
EN ********2
EN ********3
RF ETSI EN **1 ****1
ETSI EN **1 ****3
ETSI EN **0 ****2
ETSI EN **0 ****2
GSM ETSI EN **1 ****1
ETSI EN **1 ****7
FCC
Medical CFR*7 Part *8
ANSI C*3.4
Appliances CF*7 Part *5B
ANSI C*3.4
RF CFR*7 Part *5
CFR*7 Part *0
CFR*7 Part *4
CFR*7 Part *5

LCS ams to be the world’s leading inspection, verification, testing and certification company. Our network and associates in Asian, American, Europe, Australia and Russia can provide you the services of approvals marks on CE mark, GS mark, TÜV mark, AU approvals, KC mark (Korea Certification), CCC mark, PSE mark, SASO and GOST-R etc.

Shenzhen LCS Compliance Testing Laboratory
1F., Xingyuan Industrial Park, Tongda Road, Bao'an Blvd.,
Bao'an District, Shenzhen, Guangdong, China

Edison Xia     Sales Manager
M ail: edison.xia(at)lcs-cert.com
S kype: lcs,mster
Q Q number: *********4
P hone No.: + *6 **4 ***8 ***4

Send a direct inquiry to this supplier

至:

Mr. Edison < Shenzhen LCS Compliance Testing Laboratory Ltd. >

我想知道: