离岸价格
获取最新报价8000 ~ 12000 / Piece
|Minimum Order
位置:
shandong
最小订单价格:
最小订单:
1 Piece
包装细节:
ply wooden and steel frame
交货时间:
15 days after received the deposit
供应能力:
100 Piece per Month
付款方式:
Western Union, T/T
联系人 Ms. kelly
high-tech zone,Dongfeng East street and Yongchun Road intercharge, Weifang, Shandong
Application:
This furnace is used for refining of the molten metal in conjunction with the primary melting furnace, such as arc furnace, converter or induction furnace. It possesses the various metallurgical functions of arc heating, argon blow stirring, temperature measuring and sampling and alloying, etc. It is a critical secondary steelmaking facility for high-quality carbon steel, alloy steel, bearing steel, tool steel and stainless steel, and so it could meet the requirements of continuous casting, rolling and ingot production.
Performance:
1, mechanical parts
Including infrastructure plans, layout plans, civil engineering
requirements, platforms and cooling system, power Manual, the use
of electric furnace maintenance manuals and operational procedures
IF power notes.
Hydraulic schematics, hydraulic station and dumping the furnace
console plans and hydraulic parts list. Hydraulic System
Manual.
2, electrical parts
Including the main circuit electrical schematics, external wiring
diagram, IF Power Maintenance Manual, the control system failure
ruled out inspection guidance manuals.
All drawings and technical information on a duplicate. In the
contract after the commencement of advances to two weeks after the
delivery, drawings and other technical information with the
equipment delivered.
Model explanation:
Magnetic steel used hydraulic transmission Conjugate structure, by the shell, sensors, magnetic conjugate, refractories, dumping furnace, water-cooled cable component.
Structure:
Electrical parts of the equipment include rectification transformer, low-voltage switch cabinet, medium frequency power cabinet, filter reactor, and compensation capacitor bank and water tank.
Equipment Constitution:
In all the equipment manufacturers has been completed, the buyer
the invitation of the technical staff to the equipment
manufacturing plants, to participate in the pre-inspection
equipment and training.
6.1 Pre-acceptance content
1) general inspection
2) security check
3) Body size detection assembly
4) induction loop insulation manufacturing quality inspection and
pressure test
5) induction coil and the electric space heaters shell
measuring
6) and the furnace shell coil insulation resistance measurement
7) and the furnace coil magnetic yoke of insulation resistance
measurement
8) IF furnace insulation pressure test
9) the hydraulic test coil
*0) matching pieces of inspection, including models,
specifications, pre-certification inspection
*1) Availability of pre-check the integrity of the technical
documents