详情
Brief
Description
With
electric hoist and grab as its lifting mechanism, the electric
single girder overhead crane with grab can be used to grab and move
material in power plant, rubbish station and so on place to improve
work efficiency with low investment.
Main Technical
Specification
-
Lifting capacity is 3t and 5t.
- The
span (from railcenter to railcenter) ranged from 7.5m to
*2.5m.
-
Lifting speed is *6m/min, or as customer’s
requirement.
- Max.
lifting height is *8m.
-
Density of material to be grab is less than 1t/m3.
-
Trolley traversing speed is *0m/min or *0m/min.
-
Crane traveling speed is *0m/min, *0m/min, *5m/min for ground
control, and *5m/min, *0m/min, *5m/min for cabin
control.
- Grab
capacity can be 0.*5m3 or 1.5m3.
-
Control method can be pendant control / ground control or cabin
control.
- The
working duty is A5.
- The
working ambient is **5℃-**0℃.
Material for Crane
Construct
-
Material for general crane construct is Q**5B, which should be
changed into Q**5B when the limit temperature is below **0
centigrade.
-
Material for crane wheel is *5Mn or *2 CrMo.
Component Used on
Crane
-
Electric motor is well-known one in China, like Nanjing Special
Motor.
- Such
important electric components as breaker, contactor is of
Schneider.
-
Other ones can be followed according to our customer’s
requirement.
Package
- Main
girder and end carriage are nude and covered by rain-proof
clothes.
- Grab
and accessories are nude.
-
Other components like electric motor, electric hoist, cable and so
on in wooden box.
Delivery
-
Delivery time for the whole crane is *0 working days after payment
advance.
Shipment
-
Dispatch port can be Qingdao Port, Shanghai Port, Tianjin Port or
so on China port.
- Open
top container will be recommended for the crane and grab with main
girder is less than *2m.
-
General *0’ GP can also be used for crane with length of main
girder is more than *2m.
- We
can recommend our forward to our customer, and the forward
appointed by our customer is also appreciated.
……
Generally speaking, special attention has been
taken to the manufacture and operation of single girder overhead
crane with grab, with the aim to work efficiently and comfortably.
Your
comments or other question, will be much welcome!