看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。
点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell  double roller crusher

Sell double roller crusher

离岸价格

获取最新报价

1000 ~ 100000 / Piece ( Negotiable )

|

Minimum Order

位置:

China

最小订单价格:

最小订单:

1 Piece

包装细节:

wooden box and steel wire to fix

交货时间:

within one month

供应能力:

1000 Piece per Month

付款方式:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other

现在联系
免费会员

联系人 Ms. Anne

Room 409, 4/F, No.109, Zaozhuang, Jingsan Road, Jinshui District, Zhengzhou, Henan, China (Mainland), Zhengzhou, Henan

现在联系

详情

Operation Regulation of the Machine
The machine is allowed to put into production formally after the trial running is fully qualified. To ensure the safe running of the machine for a long term, correct operation and routine maintenance as well as regular troubleshooting shall be conducted.

1. Preparation Work Prior to the Running of the Machine
Full preparation work as well as strict inspection work shall be conducted before the normal startup and running of the machine. For the machine, all parts shall be complete and without defects, all fixing bolts and anchor bolts shall be tightened firmly, and accessories shall be free from objects and sundries which may exert negative influence on the running.
2. Procedure of Startup and Shutdown
After the above-mentioned preparation and examination works are all in accordance with the requirements, crusher can be started up. Materials can be fed evenly into the machine after the rotation speed goes smoothly. Stop feeding first when shut down the machine, and the machine can be stopped after there are no residual materials in the feed hopper.
3. Normal Running of the Machine:
After the normal running of the machine is conducted, machine operators and relevant personnel shall pay attention to the following things:
1Whether the fixing bolt is broken down or loosened;
2Whether the lubrication situation of all bearings is normal and there is overheating;
3Whether all sealing is firm and there is oil leakage;
4Whether the amount of material fed is excessive and the particle size of the material
discharged is in accordance with the requirements;
5Whether the toothed rolls and gears run smoothly.
4. Other Notices:
1Rotation direction of the machine shall not be changed.
2If there is a power failure when running, cut the power at once to avoid accidents caused by sudden supply of power.

Send a direct inquiry to this supplier

至:

Ms. Anne < SAF International Industrial Equipment Co.Ltd >

我想知道: