离岸价格
获取最新报价10000 ~ 20000 / Set ( Negotiable )
|Minimum Order
位置:
Hebei, China (Mainland)
最小订单价格:
最小订单:
1 Set
包装细节:
nude packing
交货时间:
20 days after deposit
供应能力:
30 Set per Month
付款方式:
T/T, L/C, Money Gram
联系人 Ms. Alice
Nancang Street, Botou, Cangzhou, Hebei, China (Mainland), Cangzhou, Hebei
1.Leak frame load-bearing:4T
2. Rack: welding with **0H steel
3. The form of forming machine guiding filling: side skip
4.The form of forming machine: chain drive with wallboard type, the thickness of wallboard is *2mm.
5. Diameter of Shaft is: *2mm
6.Chain: 0.6 inch single row
7. Main motor power:3kw double pole reduction box
8. Forming Speed: 8m/min
9. Number of tracks: *8tracks
*0. Roller material: high grade *5#steel
*1 Hydraulic station power: 3kw
*2 Hydraulic station oil pump: gearpump
*3 Cutting type: hydraulic cut
*4 Forming Cutting blade: Cr*2
*5 Heat treatment on cutting blade: HRC*8°**0°
*6 Thickness of coil sheet: 0.**0.8mm
*7 Coil width of material: ***0mm
*8 Index error of length: ±2mm
*9 Controlling system: PLC
*0 Voltage: **0V 3phase *0 HZ or at buyer’s requirement