看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell 1000W Power frequency inverter

Sell 1000W Power frequency inverter

离岸价格

获取最新报价

|

Minimum Order

位置:

CHINA

最小订单价格:

-

最小订单:

-

包装细节:

Wooden box

交货时间:

1 week

供应能力:

1000 Set per Day

付款方式:

-

现在联系
免费会员

联系人 Mr. JACKEE

Fuyong, Shenzhen, China, Shenzhen, Guangdong

现在联系

详情

 
PS W7 Series Pure Sine Wave Inverter

Pure sine wave combined inverter charge
*-step progressive charging 7 battery type selector
Easy to install & easy to use
High-power, Multi-stage Battery charger
Automatically and swiftly line to battery switchover
High efficiency using line-interactive circuit topology
Microprocessor control guarantees high reliability
Bypass without battery connected
Remote control function
 
 
 
Basic wiring for the Power Star W7 Series
 

 
 
Warning:    High voltage, do not open unless qualified to do so;
 Please read instructions before working on this product.
 
 
 
 
 
 


 
When the PS W7 is in the inverter mode , the ‘ through the box’ earth line is automatically disconnected from the input earth and joined to the output neutral, complying with the natural earth inverter requirements if you what to maintain a trough earth simply connect the input earth to the output earth.
 
WHAT CABLE TO USE in mm2:
 
A charger or inverter Cable run distance
**1.*4m
Cable run distance
1.**4.0m
******0 A *0 mm2 *0 mm2
******0 A *0 mm2 *0 mm2
 
Please note that if there is a problem obtaining, for example *0 mm2 cable, use 2**0 mm2, or 3**5 mm2. To adopt one cable is always the best, cable is simply copper and all require ins the copper, so it does not matter if it is one cable for ten cables as long as the square areas adds up.
Performance of any products can be improved by thicker cable and shorter runs, so if just keep the length as short as possible.

 
Check list
  1. Ensure that the inverter has the correct DC voltage for your boat or vehicle system. ie *2v or *4v/*8v.
  2. Fit as close to the batteries as possible, the shorter the DC cables the better. Voltage drop on long cables will effect the unit’s performance.
  3. Do not reverse the cables! Connect the red cable to the positive terminal and the black cable to the negative terminal of the battery. In the event of reverse polarity the unit could be totally destroyed.
  4. Always use the inverter in an environment which is well ventilated, not exposed to direct sunlight or a heat source, away from water, moisture, oil or grease, away from any highly inflammable substance, out of reach from children.
  5. The output voltage of this unit must never be on your AC system at the same time as any other AC source such as the **0V external mains line or a generator. All external power must go through the PSW7.
  6. Always switch on the PSW7 first, before plugging in any appliance.
  7. Under new electrical legation only professional electrocutions should install the product.
Ensure the fitting instructions are fully understood before fitting this product.
Installation
  1. Position the unit as close to the main battery bank as possible
  2. Position in a cool, dry & well ventilated space.
  3. Orientation of the unit is not critical.
  4. Either purchase the standard cable set from Dealer which is about 1.5 meters, or if using your own cable, use the cable size chart provided on the installation drawing to ensure you have thick enough cable for the DC leads. In the event of not being able to get the size requested (it cab be hard to get thick cable) then simply add multiple length of thinner cable, i.e. if you cannot get*0mm2cable then use 3 **5 mm2  cable, ate the end of the day its just copper we need.
  5. Fit a fuse suitable for the job, again look at the installation drawing. We have a full range of hihg current fuses in the GANLR range of gold fuse products, ranging form ******0 Am Ps.on the DC side
  6. Connect the cables from the batteries to the fuse then to the unit, this way if there is a fault at the unit the fuse is already in place and this will be safe. In the event of a isolation switch being used, please ensure the rating of the switch can handle the power of the unit.
  7. Ensure the the unit is switched off during installation.
  8. On the AC side ensure the shore power (all external AC sources) are totally disconnected, connect the output from the inverter to suitable Residual Current Breaker (R.C.D for the earth protection) and current over load trips Fuse the AC input side depending on through power requirements, the max through power is *0Am Ps, so fuse at *0A (allowing also for charger consumption) if you intend to use the full through power for standard ****6 amps throughput then a *0A fuse would be appropriate.
  9. We recommend Multi core tri rated AC cable, if used on a boat or vehicle, as this is much safter where vibration is likely. Only use single solid household AC cable if the product is being used as a power source for a house or platform free of vibration.
  10. Before attempting to switch on the unit, please ensure you have selected the correct battery type on the small battery type selector switch on the front of the mian box, rotate the switch to your battery types. The progressive charge control software will automatically adjusted for battery bank size and state
 
Charge Stage Transition Definitions
  • Boost CC Stage: If AC input is applied, the charger will run at full current in CC mode until the charger reaches the boost voltage.
  • Software timer will measure the time from AC start until the battery charger reaches 0.3V below the boost voltage, then take this time as T0  and T0  * *0= T1.  
  • Boost CV Stage: Start a T1.  timer; the charger will keep the boost voltage in Boost CV mode until the T1.  timer has run out. Thn drop the voltage down to the float voltage. The timer has minimum time of 1 hour and a maximum time of *2 hours.
  • Float Stage: In float mode, the voltage will stay at the float voltage.
  • If the AC is reconnected or the battery voltage drops below *2Vdc/*4Vdc, the charger will reset the cycle above.
  • If the charge maintains the float state for *0days, the charger will reset the cycle.

 
The battery type and charge voltage recommendations are set out above For *4V unit x the above by 2. Some battery types may look confusing such as GEL USA and GEL EURO, AGM USA and AGM EURO. If you find this confusion then join the club, we have had the different voltage curves supplied to us by different companies form the U.S.A. and Eruope for what we seem the same product, however it’s not our call, we simply supply the options,if in doubt call your battery supplier and ask which charge voltage they want you to use for their battery type, and select the closest to it. If totally confused then use the lower voltage setting until you have had a higher voltage setting confirmed to you by whoever supplied the batteries to you.
The de-sulphation cycle on switch position 8 is marked in red because this is a very dangerous setting if you do not know what you are.doing. Before even attempting to use this cycle you must clearly understand what it does and when and how you would use it. What causes sulphation? This can occur with infrequent use of the batteries, or if the batteries have been left discharged so low that they will not accept a charge. This cycle is very high voltage charge cycle designed to try to break down the sulphate ‘crust’ that is preventing the plates taking a charge and thus allow the plates to clean up and so accept charge once again.
How to use this function.(only suitable for open lead acid batteries)
  1. Ensure the battery bank is totally isolated from anything else on the boat or vehicle; the high voltage applied by this setting could destroy all your electronics and other electrical equipment still connnected (hence all these instructions are in red, this is a very dangerous mistake.)
  2. Make sure the battery compartment is very well ventilated and battery caps are removed.
  3. Switch the battery type selector to the correct position, then switch the AC power on.
  4. Because this is such a dangerous setting there is a 4 hr time out period build into the software, however on a very large battery bank this may not be enough and the unit may need to be switched off and on again to do another cycle.
  5. What to expect on this cycle.
I would recommend you monitor the voltage of the sulphated battery bank. When you switch on the cycle the voltage should shoot up to the full *5.5volts very fast (within minutes) this is because the batteries cannot accept the charge(assuming they are sulphated). However, over a period of 1~2 hrs the voltage should start to drop ( as the plates start to clean and the batteries start to take charge) the voltage could drop way down to about *2.5 volts then start to rise. This shows the batteries are now taking a charge and starting to fill up. In this case it would be safe to switch the unit off and select your normal charging curve and hopefully this will bring your batteries back from the dead.
You may need to repeat the process a few times. Please note this is a professional guess tool, which most times helps, but its not magic, so expect the worst and hope for the best. Never leave a system unattended when on this mode. If the battery temperature reaches above *0deg c (ie. If the batteries are almost too hot to touch) then stop the process).
Install remote control.
Isolate the unit before attempting this so there are no high voltages. The local control panel on the front of the unit can also be used as a remote control, reveal the screws holding the panel onto the main box, carefully remove the panel and disconnect it from the connection socket behind the unit.
Using the remote cable supplied then re-connect the panel to the unit
Operation and what to expect
  1. After the unit is installed, using the panel on the front of the unit, and with the shore power (**0/**0VAC) still disconnected, switch the unit on. The leds will cycle through the test routine, then the unit should go into inverter mode and **0/**0V should be produced on the output AC terminals(provided the batteries are over *1 volts).
  2. If the above is ok, then connect the shore power to feed **0/**0V into the PSW7, after a short while, the inverter should go off line, and feed the shore power through the inveter. Changeover is about *0 millisecs (so fast that you should not be able to notice it) and the battery charger should come on-line and go through it’s charge sequence ending, after ***0hrs, with float voltage.
Common Faults:
There are numerous faults which the unit can detect and transmit the fault to you by the use of LED lights and alarm on the unit itself. The remote control gives a little help but the real fault finding can only take place at the unit. Please see the fault finding chart over the page for full information.
 
 
 
 
 
 
 
 
 
General specification PS  W7
Input Wave Form

Send a direct inquiry to this supplier

至:

Mr. JACKEE < shenzhen terry power co., ltd >

我想知道: