看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell dog food processing line

Sell dog food processing line

离岸价格

获取最新报价

( Negotiable )

|

Minimum Order

位置:

China

最小订单价格:

-

最小订单:

1 Piece

包装细节:

wooden case

交货时间:

30 days

供应能力:

1000 Piece per Month

付款方式:

T/T

现在联系
免费会员

联系人 Mr. Zhang

Wr6132, East Fushou, Weifang, Weifang, Shandong

现在联系

详情

TECHNICAL PARAMETERS & RELEVANT SERVICES
1.Output: ******0 Kg/hr
2. Square for workshop: *8m2  and 5m high
3. Installed Capacity: *0kw
4. Voltage / Frequency (3 phase): **0V / *0Hz
5. Dimension (m): *4.0 x 2.0x 5
6. Workers Required: **3 Workers
7. Warranty: At least 1 year from the date of completion of the commissioning.
8. Installation/Operation/ Service/ Maintenance Manual:  Provided In English
PRE-SHIPMENT INSPECTION INCLUDES
 

  • Supplier should trial run whole line at supplier’s factory before shipment;
  • All raw materials for that trial run to be arranged by supplier at their cost.
EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES 
 
  1. Free consultation service before, during, and after sales;
  2. Free project planning and design services;
  3. Free debugging of equipment until everything is functional;
  4. Free management of equipments' long distance shipping;
  5. Free training of equipment maintenance and operating personally;
  6. Free new production techniques and formulas;
  7. Provide 1 year complete warrantee and lifetime maintenance service;        
INSTALLATION SUPERVISION AND COMMISSIONING Including salaries based on *0 hours per week as well as accident-and health insurance for:
 
  • Chief Installation Engineer for the duration of two weeks in total.   
  • Process Engineer for the duration of two weeks in total,
  • Electrical commissioning-Engineer for the duration of two weeks in total
The customer will be asked to provide room, board, round-trip transportation, and a nominal $*0 daily subsidy per person.
 
Period of installation:
The total length of the installation time depends on number and qualification of the available local stuff. A possible delay of the installation period will be additionally invoiced.
Remark: We will provide on-site service after 1 year. The customer will be asked to provide room, board, round-trip transportation, and a nominal $*0 daily subsidy per person.
 

Send a direct inquiry to this supplier

至:

Mr. Zhang < Sino APS Company Limited >

我想知道: